<capitalprogram>
  <activecapprojects>
    <longitude>-77.234416</longitude>
    <latitude>42.97878</latitude>
    <locationdescription>ML - MP: 340.2</locationdescription>
    <numlocations>1</numlocations>
    <description>Manchester Maintenance Section: Addition and Roof Replacement</description>
    <contractor>Iversen Construction Corp.</contractor>
    <contractno>TAS 25-9A/D215012</contractno>
    <division>Syracuse</division>
    <id>A864.1</id>
    <projectclass>T</projectclass>
    <lowbidamount>$2,194,200.00</lowbidamount>
    <estimatedcompletiondate>2026</estimatedcompletiondate>
    <lettingdate>10/01/2025</lettingdate>
  </activecapprojects>
  <activecapprojects>
    <longitude>-76.671009</longitude>
    <latitude>43.023826</latitude>
    <locationdescription>Port Byron Service Area</locationdescription>
    <numlocations>1</numlocations>
    <description>MP 310 EB: Port Byron Service Area - Replace Waterline</description>
    <contractor>Bellamy Construction Company, Inc.</contractor>
    <contractno>TAS 26-10A/D215078</contractno>
    <division>Syracuse</division>
    <id>A865.4</id>
    <projectclass>T</projectclass>
    <lowbidamount>$770,000.00</lowbidamount>
    <estimatedcompletiondate>2027</estimatedcompletiondate>
    <lettingdate>01/07/2026</lettingdate>
  </activecapprojects>
  <activecapprojects>
    <longitude>-76.828656</longitude>
    <latitude>42.969782</latitude>
    <locationdescription>BLACK BROOK RD. BRIDGE</locationdescription>
    <numlocations>3</numlocations>
    <description>Syracuse Division: Clean and Re-coat Weathering Steel Bridges</description>
    <contractor>Amstar of Western New York, Inc.</contractor>
    <contractno>TAS 26-5BP/D215062</contractno>
    <division>Syracuse</division>
    <id>B288.1</id>
    <projectclass>T</projectclass>
    <lowbidamount>$1,725,000.00</lowbidamount>
    <estimatedcompletiondate>2026</estimatedcompletiondate>
    <lettingdate>01/21/2026</lettingdate>
  </activecapprojects>
  <activecapprojects>
    <longitude>-76.288834</longitude>
    <latitude>43.106837</latitude>
    <locationdescription>VAN BUREN ROAD BRIDGE</locationdescription>
    <numlocations>3</numlocations>
    <description>Syracuse Division: Clean and Re-coat Weathering Steel Bridges</description>
    <contractor>Amstar of Western New York, Inc.</contractor>
    <contractno>TAS 26-5BP/D215062</contractno>
    <division>Syracuse</division>
    <id>B288.1</id>
    <projectclass>T</projectclass>
    <lowbidamount>$1,725,000.00</lowbidamount>
    <estimatedcompletiondate>2026</estimatedcompletiondate>
    <lettingdate>01/21/2026</lettingdate>
  </activecapprojects>
  <activecapprojects>
    <longitude>-76.924872</longitude>
    <latitude>42.957992</latitude>
    <locationdescription>NINE FOOT RD. BRIDGE</locationdescription>
    <numlocations>3</numlocations>
    <description>Syracuse Division: Clean and Re-coat Weathering Steel Bridges</description>
    <contractor>Amstar of Western New York, Inc.</contractor>
    <contractno>TAS 26-5BP/D215062</contractno>
    <division>Syracuse</division>
    <id>B288.1</id>
    <projectclass>T</projectclass>
    <lowbidamount>$1,725,000.00</lowbidamount>
    <estimatedcompletiondate>2026</estimatedcompletiondate>
    <lettingdate>01/21/2026</lettingdate>
  </activecapprojects>
  <activecapprojects>
    <longitude>-78.990628</longitude>
    <latitude>43.068743</latitude>
    <locationdescription>NORTH GRAND ISLAND NB (OLD) BRIDGE</locationdescription>
    <numlocations>4</numlocations>
    <description>North and South Grand Island Bridges: Retrofit / Repair Roller Bearings, Pins and Hangers | Related: North Grand Island Bridges - Steel Repairs</description>
    <contractor>Piasecki Steel Construction</contractor>
    <contractno>TAN 23-15B/D214897</contractno>
    <division>Buffalo</division>
    <id>B469.1</id>
    <projectclass>T</projectclass>
    <lowbidamount>$67,705,000.00</lowbidamount>
    <estimatedcompletiondate>2026</estimatedcompletiondate>
    <lettingdate>04/19/2023</lettingdate>
  </activecapprojects>
  <activecapprojects>
    <longitude>-78.936632</longitude>
    <latitude>42.998643</latitude>
    <locationdescription>S. GRAND IS. NB (NEW) BRIDGE</locationdescription>
    <numlocations>4</numlocations>
    <description>North and South Grand Island Bridges: Retrofit / Repair Roller Bearings, Pins and Hangers | Related: North Grand Island Bridges - Steel Repairs</description>
    <contractor>Piasecki Steel Construction</contractor>
    <contractno>TAN 23-15B/D214897</contractno>
    <division>Buffalo</division>
    <id>B469.1</id>
    <projectclass>T</projectclass>
    <lowbidamount>$67,705,000.00</lowbidamount>
    <estimatedcompletiondate>2026</estimatedcompletiondate>
    <lettingdate>04/19/2023</lettingdate>
  </activecapprojects>
  <activecapprojects>
    <longitude>-78.936907</longitude>
    <latitude>42.998376</latitude>
    <locationdescription>S. GRAND IS. SB (OLD) BRIDGE</locationdescription>
    <numlocations>4</numlocations>
    <description>North and South Grand Island Bridges: Retrofit / Repair Roller Bearings, Pins and Hangers | Related: North Grand Island Bridges - Steel Repairs</description>
    <contractor>Piasecki Steel Construction</contractor>
    <contractno>TAN 23-15B/D214897</contractno>
    <division>Buffalo</division>
    <id>B469.1</id>
    <projectclass>T</projectclass>
    <lowbidamount>$67,705,000.00</lowbidamount>
    <estimatedcompletiondate>2026</estimatedcompletiondate>
    <lettingdate>04/19/2023</lettingdate>
  </activecapprojects>
  <activecapprojects>
    <longitude>-78.990942</longitude>
    <latitude>43.06869</latitude>
    <locationdescription>NORTH GRAND ISLAND SB (NEW) BRIDGE</locationdescription>
    <numlocations>4</numlocations>
    <description>North and South Grand Island Bridges: Retrofit / Repair Roller Bearings, Pins and Hangers | Related: North Grand Island Bridges - Steel Repairs</description>
    <contractor>Piasecki Steel Construction</contractor>
    <contractno>TAN 23-15B/D214897</contractno>
    <division>Buffalo</division>
    <id>B469.1</id>
    <projectclass>T</projectclass>
    <lowbidamount>$67,705,000.00</lowbidamount>
    <estimatedcompletiondate>2026</estimatedcompletiondate>
    <lettingdate>04/19/2023</lettingdate>
  </activecapprojects>
  <activecapprojects>
    <longitude>-75.300772</longitude>
    <latitude>43.129846</latitude>
    <locationdescription>ORISKANY BLVD. RT. 69 BRIDGE</locationdescription>
    <numlocations>1</numlocations>
    <description>Thruway Bridge over Oriskany Boulevard (Route 69): Replacement</description>
    <contractor>Tioga Construction Company</contractor>
    <contractno>TAS 24-20B/D214978</contractno>
    <division>Syracuse</division>
    <id>B499.1</id>
    <projectclass>T</projectclass>
    <lowbidamount>$9,315,273.99</lowbidamount>
    <estimatedcompletiondate>2026</estimatedcompletiondate>
    <lettingdate>05/29/2024</lettingdate>
  </activecapprojects>
  <activecapprojects>
    <longitude>-74.165323</longitude>
    <latitude>41.124711</latitude>
    <locationdescription>FOURTH STREET BRIDGE</locationdescription>
    <numlocations>5</numlocations>
    <description>New York Division: Paint 5 Bridges with Poor Paint Condition Ratings</description>
    <contractor>Rover Contracting Inc.</contractor>
    <contractno>TANY 25-3BP/D214623</contractno>
    <division>New York</division>
    <id>B635.1</id>
    <projectclass>T</projectclass>
    <lowbidamount>$7,545,000.00</lowbidamount>
    <estimatedcompletiondate>2027</estimatedcompletiondate>
    <lettingdate>09/17/2025</lettingdate>
  </activecapprojects>
  <activecapprojects>
    <longitude>-73.923248</longitude>
    <latitude>41.082221</latitude>
    <locationdescription>SO. NYACK INTERCHANGE BRIDGE</locationdescription>
    <numlocations>5</numlocations>
    <description>New York Division: Paint 5 Bridges with Poor Paint Condition Ratings</description>
    <contractor>Rover Contracting Inc.</contractor>
    <contractno>TANY 25-3BP/D214623</contractno>
    <division>New York</division>
    <id>B635.1</id>
    <projectclass>T</projectclass>
    <lowbidamount>$7,545,000.00</lowbidamount>
    <estimatedcompletiondate>2027</estimatedcompletiondate>
    <lettingdate>09/17/2025</lettingdate>
  </activecapprojects>
  <activecapprojects>
    <longitude>-73.921845</longitude>
    <latitude>41.079702</latitude>
    <locationdescription>ERIE RR &amp; 9W NB RAMP BRIDGE</locationdescription>
    <numlocations>5</numlocations>
    <description>New York Division: Paint 5 Bridges with Poor Paint Condition Ratings</description>
    <contractor>Rover Contracting Inc.</contractor>
    <contractno>TANY 25-3BP/D214623</contractno>
    <division>New York</division>
    <id>B635.1</id>
    <projectclass>T</projectclass>
    <lowbidamount>$7,545,000.00</lowbidamount>
    <estimatedcompletiondate>2027</estimatedcompletiondate>
    <lettingdate>09/17/2025</lettingdate>
  </activecapprojects>
  <activecapprojects>
    <longitude>-73.923804</longitude>
    <latitude>41.083127</latitude>
    <locationdescription>FRANKLIN ST. EXTENSION BRIDGE</locationdescription>
    <numlocations>5</numlocations>
    <description>New York Division: Paint 5 Bridges with Poor Paint Condition Ratings</description>
    <contractor>Rover Contracting Inc.</contractor>
    <contractno>TANY 25-3BP/D214623</contractno>
    <division>New York</division>
    <id>B635.1</id>
    <projectclass>T</projectclass>
    <lowbidamount>$7,545,000.00</lowbidamount>
    <estimatedcompletiondate>2027</estimatedcompletiondate>
    <lettingdate>09/17/2025</lettingdate>
  </activecapprojects>
  <activecapprojects>
    <longitude>-74.084369</longitude>
    <latitude>41.108869</latitude>
    <locationdescription>SPRING VALLEY-SUFFERN RT.59 BRIDGE</locationdescription>
    <numlocations>5</numlocations>
    <description>New York Division: Paint 5 Bridges with Poor Paint Condition Ratings</description>
    <contractor>Rover Contracting Inc.</contractor>
    <contractno>TANY 25-3BP/D214623</contractno>
    <division>New York</division>
    <id>B635.1</id>
    <projectclass>T</projectclass>
    <lowbidamount>$7,545,000.00</lowbidamount>
    <estimatedcompletiondate>2027</estimatedcompletiondate>
    <lettingdate>09/17/2025</lettingdate>
  </activecapprojects>
  <activecapprojects>
    <longitude>-77.651297</longitude>
    <latitude>43.047775</latitude>
    <locationdescription>W. HENRIETTA INTER. BRIDGE</locationdescription>
    <numlocations>1</numlocations>
    <description>MP 362.44: West Henrietta Interchange Bridge over Thruway - Replacement; OHSS at Int. 46</description>
    <contractor>Cold Spring Cpnstruction Company</contractor>
    <contractno>TAB 25-17B/D215040</contractno>
    <division>Buffalo</division>
    <id>B724.1</id>
    <projectclass>T</projectclass>
    <lowbidamount>$10,963,399.66</lowbidamount>
    <estimatedcompletiondate>2026</estimatedcompletiondate>
    <lettingdate>10/08/2025</lettingdate>
  </activecapprojects>
  <activecapprojects>
    <longitude>-74.993612</longitude>
    <latitude>43.017616</latitude>
    <locationdescription>MOHAWK ST RT 28 BRIDGE</locationdescription>
    <numlocations>1</numlocations>
    <description>Thruway Bridge Over Mohawk Street (Route 28): Replacement</description>
    <contractor>Slate HIll Constructors, INC</contractor>
    <contractno>TAS 24-21B/D214922</contractno>
    <division>Syracuse</division>
    <id>B742.1</id>
    <projectclass>T</projectclass>
    <lowbidamount>$20,528,410.01</lowbidamount>
    <estimatedcompletiondate>2026</estimatedcompletiondate>
    <lettingdate>12/18/2024</lettingdate>
  </activecapprojects>
  <activecapprojects>
    <longitude>-74.145894</longitude>
    <latitude>41.120325</latitude>
    <locationdescription>MAHWAH RIVER BRIDGE</locationdescription>
    <numlocations>2</numlocations>
    <description>NY Division: Bridge Preservation for MP 29.54 - Thruway over Suffren-Mt. Ivy Route 202</description>
    <contractor>Defoe Corporation</contractor>
    <contractno>TANY 24-26B/D214984</contractno>
    <division>New York</division>
    <id>B776.2</id>
    <projectclass>T</projectclass>
    <lowbidamount>$19,331,680.23</lowbidamount>
    <estimatedcompletiondate>2026</estimatedcompletiondate>
    <lettingdate>06/26/2024</lettingdate>
  </activecapprojects>
  <activecapprojects>
    <longitude>-74.148469</longitude>
    <latitude>41.119505</latitude>
    <locationdescription>SUFFREN-MT. IVY RT. 202 BRIDGE</locationdescription>
    <numlocations>2</numlocations>
    <description>NY Division: Bridge Preservation for MP 29.54 - Thruway over Suffren-Mt. Ivy Route 202</description>
    <contractor>Defoe Corporation</contractor>
    <contractno>TANY 24-26B/D214984</contractno>
    <division>New York</division>
    <id>B776.2</id>
    <projectclass>T</projectclass>
    <lowbidamount>$19,331,680.23</lowbidamount>
    <estimatedcompletiondate>2026</estimatedcompletiondate>
    <lettingdate>06/26/2024</lettingdate>
  </activecapprojects>
  <activecapprojects>
    <longitude>-74.01605</longitude>
    <latitude>42.790515</latitude>
    <locationdescription>INTERSTATE 88 INTER. BRIDGE</locationdescription>
    <numlocations>3</numlocations>
    <description>Albany Division: Cleaning and Re-Coat Weather Steel Bridges 2025</description>
    <contractor>Erie Painting&amp;Maintenance Inc</contractor>
    <contractno>TAA 25-4BP/D215006</contractno>
    <division>Albany</division>
    <id>B782.2</id>
    <projectclass>T</projectclass>
    <lowbidamount>$2,599,999.99</lowbidamount>
    <estimatedcompletiondate>2026</estimatedcompletiondate>
    <lettingdate>09/10/2025</lettingdate>
  </activecapprojects>
  <activecapprojects>
    <longitude>-73.962076</longitude>
    <latitude>42.767298</latitude>
    <locationdescription>CHURCH RD. CO. RD. 7R BRIDGE</locationdescription>
    <numlocations>3</numlocations>
    <description>Albany Division: Cleaning and Re-Coat Weather Steel Bridges 2025</description>
    <contractor>Erie Painting&amp;Maintenance Inc</contractor>
    <contractno>TAA 25-4BP/D215006</contractno>
    <division>Albany</division>
    <id>B782.2</id>
    <projectclass>T</projectclass>
    <lowbidamount>$2,599,999.99</lowbidamount>
    <estimatedcompletiondate>2026</estimatedcompletiondate>
    <lettingdate>09/10/2025</lettingdate>
  </activecapprojects>
  <activecapprojects>
    <longitude>-74.018599</longitude>
    <latitude>42.806098</latitude>
    <locationdescription>PUTNAM RD. CO. RD. 26R BRIDGE</locationdescription>
    <numlocations>3</numlocations>
    <description>Albany Division: Cleaning and Re-Coat Weather Steel Bridges 2025</description>
    <contractor>Erie Painting&amp;Maintenance Inc</contractor>
    <contractno>TAA 25-4BP/D215006</contractno>
    <division>Albany</division>
    <id>B782.2</id>
    <projectclass>T</projectclass>
    <lowbidamount>$2,599,999.99</lowbidamount>
    <estimatedcompletiondate>2026</estimatedcompletiondate>
    <lettingdate>09/10/2025</lettingdate>
  </activecapprojects>
  <activecapprojects>
    <longitude>-78.899216</longitude>
    <latitude>42.929736</latitude>
    <locationdescription>SCAJAQUADA CREEK BRIDGE</locationdescription>
    <numlocations>1</numlocations>
    <description>Thruway Bridge over Scajaquada Creek - Retaining Wall Stabilization</description>
    <contractor>McLaughlin Construction Corp DBA Edbauer Construction</contractor>
    <contractno>TAN 25-20B/D215043</contractno>
    <division>Buffalo</division>
    <id>B784.1</id>
    <projectclass>T</projectclass>
    <lowbidamount>$7,788,702.58</lowbidamount>
    <estimatedcompletiondate>2026</estimatedcompletiondate>
    <lettingdate>11/12/2025</lettingdate>
  </activecapprojects>
  <activecapprojects>
    <longitude>-73.773216</longitude>
    <latitude>42.509336</latitude>
    <locationdescription>CASTLETON-ON-HUDSON BRIDGE</locationdescription>
    <numlocations>1</numlocations>
    <description>MP 801.08: Castleton Bridge - Rehabilitation</description>
    <contractor>DA Collins Construction</contractor>
    <contractno>TABS 24-2B/D214946</contractno>
    <division>Albany</division>
    <id>B786.1</id>
    <projectclass>T</projectclass>
    <lowbidamount>$38,231,998.84</lowbidamount>
    <estimatedcompletiondate>2026</estimatedcompletiondate>
    <lettingdate>06/26/2024</lettingdate>
  </activecapprojects>
  <activecapprojects>
    <longitude>-73.957909</longitude>
    <latitude>42.108425</latitude>
    <locationdescription>MALDEN ROAD BRIDGE</locationdescription>
    <numlocations>1</numlocations>
    <description>MP 103.16: Malden Road - Replacement</description>
    <contractor>A. Colarusso and Son, Inc</contractor>
    <contractno>TAA 25-27B/D215051</contractno>
    <division>Albany</division>
    <id>B787.1</id>
    <projectclass>T</projectclass>
    <lowbidamount>$8,189,981.50</lowbidamount>
    <estimatedcompletiondate>2026</estimatedcompletiondate>
    <lettingdate>11/12/2025</lettingdate>
  </activecapprojects>
  <activecapprojects>
    <longitude>-73.826385</longitude>
    <latitude>40.856202</latitude>
    <locationdescription>NE - MP: 600.17 to 614.11</locationdescription>
    <numlocations>1</numlocations>
    <description>I-95 (New England Thruway) Bridge Maintenance Cleaning for Steel Preservation - 2026</description>
    <contractor>DD&amp;N Contracting LLC</contractor>
    <contractno>TANE 26-2B/D215058</contractno>
    <division>New York</division>
    <id>B800.1</id>
    <projectclass>T</projectclass>
    <lowbidamount>$398,000.00</lowbidamount>
    <estimatedcompletiondate>2026</estimatedcompletiondate>
    <lettingdate>01/14/2026</lettingdate>
  </activecapprojects>
  <activecapprojects>
    <longitude>-75.664789</longitude>
    <latitude>43.110428</latitude>
    <locationdescription>WILLIAMS ST RT 46 BRIDGE</locationdescription>
    <numlocations>1</numlocations>
    <description>MP 257.09: North Main Street (Rte 46) Bridge over Thruway - Replacement</description>
    <contractor>Tioga Construction Inc</contractor>
    <contractno>TAS 25-30B/D215056</contractno>
    <division>Syracuse</division>
    <id>B803.1</id>
    <projectclass>T</projectclass>
    <lowbidamount>$4,895,092.95</lowbidamount>
    <estimatedcompletiondate>2026</estimatedcompletiondate>
    <lettingdate>10/22/2025</lettingdate>
  </activecapprojects>
  <activecapprojects>
    <longitude>-78.936632</longitude>
    <latitude>42.998643</latitude>
    <locationdescription>S. GRAND IS. NB (NEW) BRIDGE</locationdescription>
    <numlocations>1</numlocations>
    <description>MP 914.99 and 914.35 - Steel Repairs and Seismic Upgrades of the South Grand Island Bridges</description>
    <contractor>Advantage Steel &amp;Construction LLC</contractor>
    <contractno>TAN 25-11B/D215021</contractno>
    <division>Buffalo</division>
    <id>B871.1</id>
    <projectclass>T</projectclass>
    <lowbidamount>$54,358,863.40</lowbidamount>
    <estimatedcompletiondate>2028</estimatedcompletiondate>
    <lettingdate>01/14/2026</lettingdate>
  </activecapprojects>
  <activecapprojects>
    <longitude>-74.056268</longitude>
    <latitude>41.81731</latitude>
    <locationdescription>WALLKILL RIVER BRIDGE</locationdescription>
    <numlocations>1</numlocations>
    <description>Thruway Bridge over Wallkill River: Rehabilitation</description>
    <contractor>Harrison &amp; burrows Bridge Constructors Inc.</contractor>
    <contractno>TAA 23-25B/D214941</contractno>
    <division>Albany</division>
    <id>B975.1</id>
    <projectclass>T</projectclass>
    <lowbidamount>$23,711,237.11</lowbidamount>
    <estimatedcompletiondate>2026</estimatedcompletiondate>
    <lettingdate>02/07/2024</lettingdate>
  </activecapprojects>
  <activecapprojects>
    <longitude>-74.013773</longitude>
    <latitude>42.786664</latitude>
    <locationdescription>SCHEN.-DUANESB. RD. RT.7 BRIDGE</locationdescription>
    <numlocations>1</numlocations>
    <description>MP 158.54 Rehabilitation of Rte. 7 Bridge over Thruway</description>
    <contractor>Winn Construction Services, Inc.</contractor>
    <contractno>TAA 25-22B/D215046</contractno>
    <division>Albany</division>
    <id>B997.1</id>
    <projectclass>T</projectclass>
    <lowbidamount>$6,258,961.65</lowbidamount>
    <estimatedcompletiondate>2027</estimatedcompletiondate>
    <lettingdate>09/17/2025</lettingdate>
  </activecapprojects>
  <activecapprojects>
    <longitude>-74.288451</longitude>
    <latitude>42.931008</latitude>
    <locationdescription>RT 5S FULVIL. AMST.NYCRR BRIDGE</locationdescription>
    <numlocations>1</numlocations>
    <description>MP 178.38 Rehabilitation of Mainline Bridge over Rte. 5S</description>
    <contractor>Tioga Construction Co Inc</contractor>
    <contractno>TAA 25-6B/D215009</contractno>
    <division>Albany</division>
    <id>B998.1</id>
    <projectclass>T</projectclass>
    <lowbidamount>$12,385,679.54</lowbidamount>
    <estimatedcompletiondate>2026</estimatedcompletiondate>
    <lettingdate>01/29/2025</lettingdate>
  </activecapprojects>
  <activecapprojects>
    <longitude>-75.750894</longitude>
    <latitude>43.09158</latitude>
    <locationdescription>ML - MP: 261.7 to 268</locationdescription>
    <numlocations>1</numlocations>
    <description>Canastota (Exit 34, MP 261.7) to west of Canastota (MP 268.0): Pavement Resurfacing</description>
    <contractor>Heidelberg Materials Northeast LLC</contractor>
    <contractno>TAS 25-12/D215024</contractno>
    <division>Syracuse</division>
    <id>H141.1</id>
    <projectclass>T</projectclass>
    <lowbidamount>$13,311,944.59</lowbidamount>
    <estimatedcompletiondate>2026</estimatedcompletiondate>
    <lettingdate>10/15/2025</lettingdate>
  </activecapprojects>
  <activecapprojects>
    <longitude>-78.74674</longitude>
    <latitude>42.952069</latitude>
    <locationdescription>ML - MP: 419.4 to 425.9</locationdescription>
    <numlocations>1</numlocations>
    <description>East of Williamsville Toll Barrier (MP 419.4) to west of Buffalo-Williams Street (Exit 52A, MP 425.9): Pavement Resurfacing</description>
    <contractor>Oakgrove Construction Inc</contractor>
    <contractno>TAB 25-13/D215028</contractno>
    <division>Buffalo</division>
    <id>H144.1</id>
    <projectclass>T</projectclass>
    <lowbidamount>$64,485,017.40</lowbidamount>
    <estimatedcompletiondate>2027</estimatedcompletiondate>
    <lettingdate>11/19/2025</lettingdate>
  </activecapprojects>
  <activecapprojects>
    <longitude>-78.796228</longitude>
    <latitude>42.812373</latitude>
    <locationdescription>ML - MP: 430.6 to 438.5</locationdescription>
    <numlocations>1</numlocations>
    <description>Lackawanna Toll Barrier (MP 430.6) to west of Hamburg (Exit 57, MP 438.5): Pavement Resurfacing</description>
    <contractor>McLaughlin Construction Corp DVA Edbauer construction</contractor>
    <contractno>TAB 24-23/D214981</contractno>
    <division>Buffalo</division>
    <id>H145.1</id>
    <projectclass>T</projectclass>
    <lowbidamount>$10,974,147.67</lowbidamount>
    <estimatedcompletiondate>2026</estimatedcompletiondate>
    <lettingdate>06/12/2024</lettingdate>
  </activecapprojects>
  <activecapprojects>
    <longitude>-78.801609</longitude>
    <latitude>42.876315</latitude>
    <locationdescription>N - MP: 900.7 to 904.2</locationdescription>
    <numlocations>1</numlocations>
    <description>MP 900.7 – MP 904.2 (South end of Viaduct): Pavement Rehabilitation</description>
    <contractor>Union Concrete Corp</contractor>
    <contractno>TAN 26-14/D215082</contractno>
    <division>Buffalo</division>
    <id>H152.1</id>
    <projectclass>T</projectclass>
    <lowbidamount>$61,822,222.00</lowbidamount>
    <estimatedcompletiondate>2028</estimatedcompletiondate>
    <lettingdate>02/25/2026</lettingdate>
  </activecapprojects>
  <activecapprojects>
    <longitude>-74.02153</longitude>
    <latitude>42.787847</latitude>
    <locationdescription>Duanesburg Toll Plaza</locationdescription>
    <numlocations>2</numlocations>
    <description>Improvements at Interchange 25 &amp; 25A</description>
    <contractor>Rifenburg Construction Inc.</contractor>
    <contractno>TAA 25-8/D215011</contractno>
    <division>Albany</division>
    <id>H252.1</id>
    <projectclass>T</projectclass>
    <lowbidamount>$9,557,115.00</lowbidamount>
    <estimatedcompletiondate>2026</estimatedcompletiondate>
    <lettingdate>01/22/2025</lettingdate>
  </activecapprojects>
  <activecapprojects>
    <longitude>-73.932629</longitude>
    <latitude>42.757066</latitude>
    <locationdescription>Schenectady Toll Plaza</locationdescription>
    <numlocations>2</numlocations>
    <description>Improvements at Interchange 25 &amp; 25A</description>
    <contractor>Rifenburg Construction Inc.</contractor>
    <contractno>TAA 25-8/D215011</contractno>
    <division>Albany</division>
    <id>H252.1</id>
    <projectclass>T</projectclass>
    <lowbidamount>$9,557,115.00</lowbidamount>
    <estimatedcompletiondate>2026</estimatedcompletiondate>
    <lettingdate>01/22/2025</lettingdate>
  </activecapprojects>
  <activecapprojects>
    <longitude>-73.826357</longitude>
    <latitude>40.853287</latitude>
    <locationdescription>NE - MP: 600 to 614.1</locationdescription>
    <numlocations>1</numlocations>
    <description>I-95, New England Thruway MP 604.0 to MP 608.8: Highway Rehabilitation 2024-2026 | Related: I-95 (New England Thruway) Viaduct, Railroad Span (New Rochelle): Rehabilitation | Related: Larchmont Station Plaza: Substructure Repairs | Related: Chatsworth Avenue Bridge (MP 607.64) over I-95 (New England Thruway): Rehabilitation</description>
    <contractor>DeFoe Corp.</contractor>
    <contractno>TANE 24-19/D214945</contractno>
    <division>New York</division>
    <id>H355.1</id>
    <projectclass>T</projectclass>
    <lowbidamount>$86,660,525.34</lowbidamount>
    <estimatedcompletiondate>2026</estimatedcompletiondate>
    <lettingdate>09/25/2024</lettingdate>
  </activecapprojects>
  <activecapprojects>
    <longitude>-74.064611</longitude>
    <latitude>41.742562</latitude>
    <locationdescription>ML - MP: 76.5 to 86.8</locationdescription>
    <numlocations>1</numlocations>
    <description>North of New Paltz (Exit 18, MP 76.5) to south of Kingston (Exit 19, MP 86.8): Pavement Resurfacing</description>
    <contractor>Callanan Industries, Inc.</contractor>
    <contractno>TAA 25-19/D215042</contractno>
    <division>Albany</division>
    <id>H357.1</id>
    <projectclass>T</projectclass>
    <lowbidamount>$18,929,559.38</lowbidamount>
    <estimatedcompletiondate>2026</estimatedcompletiondate>
    <lettingdate>12/17/2025</lettingdate>
  </activecapprojects>
  <activecapprojects>
    <longitude>-73.726006</longitude>
    <latitude>40.96931</latitude>
    <locationdescription>NE - MP: 610.8 to 613</locationdescription>
    <numlocations>2</numlocations>
    <description>MP 608.8 to MP 610.8 (SB): 2" Mill and Inlay and MP 610.8 to MP 613.0: Pavement Resurfacing</description>
    <contractor>JRCruz C orp</contractor>
    <contractno>TANE 25-25/D215047</contractno>
    <division>New York</division>
    <id>H371.1</id>
    <projectclass>T</projectclass>
    <lowbidamount>$39,677,374.92</lowbidamount>
    <estimatedcompletiondate>2027</estimatedcompletiondate>
    <lettingdate>12/10/2025</lettingdate>
  </activecapprojects>
  <activecapprojects>
    <longitude>-78.697718</longitude>
    <latitude>42.949911</latitude>
    <locationdescription>ML - MP: 416.9 to 419.4</locationdescription>
    <numlocations>1</numlocations>
    <description>East of Depew (Exit 49, MP 416.90) to east of Niagara Falls  (Exit 50, MP 419.40): Pavement Resurfacing</description>
    <contractor>Oakgrove Construction Inc</contractor>
    <contractno>TAB 25-31/D214980</contractno>
    <division>Buffalo</division>
    <id>H438.1</id>
    <projectclass>T</projectclass>
    <lowbidamount>$5,416,909.40</lowbidamount>
    <estimatedcompletiondate>2026</estimatedcompletiondate>
    <lettingdate>10/22/2025</lettingdate>
  </activecapprojects>
  <activecapprojects>
    <longitude>-77.367815</longitude>
    <latitude>42.99567</latitude>
    <locationdescription>ML - MP: 347.1 to 351.4</locationdescription>
    <numlocations>1</numlocations>
    <description>Canandaigua (Exit 44, MP 347.1) to Rochester (Exit 45, MP 351.4): Pavement Rehabilitation</description>
    <contractor>Villager Construction INC</contractor>
    <contractno>TAS 24-1/D214944</contractno>
    <division>Syracuse</division>
    <id>H557.1</id>
    <projectclass>T</projectclass>
    <lowbidamount>$61,500,000.14</lowbidamount>
    <estimatedcompletiondate>2026</estimatedcompletiondate>
    <lettingdate>08/14/2024</lettingdate>
  </activecapprojects>
  <activecapprojects>
    <longitude>-73.849086</longitude>
    <latitude>42.701717</latitude>
    <locationdescription>ML - MP: 148.2 to 154.4</locationdescription>
    <numlocations>1</numlocations>
    <description>Northway (Exit 24, MP 148.2) to west of Schenectady (Exit 25, MP 154.3): Pavement Restoration</description>
    <contractor>Callanan Industries Inc</contractor>
    <contractno>TAA 25-24/D214987</contractno>
    <division>Albany</division>
    <id>H559.1</id>
    <projectclass>T</projectclass>
    <lowbidamount>$15,824,636.53</lowbidamount>
    <estimatedcompletiondate>2026</estimatedcompletiondate>
    <lettingdate>10/01/2025</lettingdate>
  </activecapprojects>
  <activecapprojects>
    <longitude>-76.989952</longitude>
    <latitude>42.954967</latitude>
    <locationdescription>ML - MP: 327.5 to 347.1</locationdescription>
    <numlocations>1</numlocations>
    <description>MP 327.5 to MP 347.1: Pavement Resurfacing</description>
    <contractor>Rifenburg Construction, Inc.</contractor>
    <contractno>TAS 26-8/D215076</contractno>
    <division>Syracuse</division>
    <id>H562.1</id>
    <projectclass>T</projectclass>
    <lowbidamount>$29,879,115.00</lowbidamount>
    <estimatedcompletiondate>2027</estimatedcompletiondate>
    <lettingdate>02/04/2026</lettingdate>
  </activecapprojects>
  <completedcapprojects>
    <longitude>-73.8039</longitude>
    <latitude>42.429633</latitude>
    <locationdescription>ML - MP: 127.28</locationdescription>
    <numlocations>1</numlocations>
    <constructionamount>$21,298,809.30</constructionamount>
    <description>Construct Capital Region Welcome Center</description>
    <completiondate>09/30/2020</completiondate>
    <lettingdate>04/04/2018</lettingdate>
    <contractor>James H Maloy, Inc.</contractor>
    <contractno>TAA 18-22/D214670</contractno>
    <contractno>TAA 18-22/D214670</contractno>
    <division>Albany</division>
    <id>A4.2</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-76.564931</longitude>
    <latitude>43.061083</latitude>
    <locationdescription>ML - MP: 304.2</locationdescription>
    <numlocations>1</numlocations>
    <constructionamount>$1,913,200.00</constructionamount>
    <description>MP 304.20: Weedsport Maintenance Section - Renovations to Section Maintenance Building and Roof Replacement</description>
    <completiondate>02/05/2025</completiondate>
    <lettingdate>01/31/2024</lettingdate>
    <contractor>Iversen Construction Corp.</contractor>
    <contractno>TAS 23-9A / TAS24-9A/D214913</contractno>
    <contractno>TAS 23-9A / TAS24-9A/D214913</contractno>
    <division>Syracuse</division>
    <id>A172.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-75.582104</longitude>
    <latitude>43.12377</latitude>
    <locationdescription>ML - MP: 252.71</locationdescription>
    <numlocations>1</numlocations>
    <constructionamount>$1,180,670.00</constructionamount>
    <description>MP 252.71: Verona Maintenance - Construct Municipal Sewer / Water Connections</description>
    <completiondate>11/04/2025</completiondate>
    <lettingdate>11/20/2024</lettingdate>
    <contractor>Bellamy Construction Company Inc</contractor>
    <contractno>TAS 24-18A/D214977</contractno>
    <contractno>TAS 24-18A/D214977</contractno>
    <division>Syracuse</division>
    <id>A354.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-74.122654</longitude>
    <latitude>41.310654</latitude>
    <locationdescription>ML - MP: 45.2</locationdescription>
    <numlocations>1</numlocations>
    <constructionamount>$613,800.00</constructionamount>
    <description>MP 45.2: Replacement of a Deteriorated Roof at the Harriman Maintenance Section Renovations and Roof Replacement</description>
    <completiondate>11/17/2023</completiondate>
    <lettingdate>11/16/2022</lettingdate>
    <contractor>.Titan Roofing Inc.</contractor>
    <contractno>TANY 22-36A/D214885</contractno>
    <contractno>TANY 22-36A/D214885</contractno>
    <division>New York</division>
    <id>A359.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.78117</longitude>
    <latitude>42.632663</latitude>
    <locationdescription>ML - MP: 141.92</locationdescription>
    <numlocations>1</numlocations>
    <constructionamount>$1,593,000.00</constructionamount>
    <description>MP 141.92: Administrative Headquarters - Computer Room Renovations</description>
    <completiondate>04/15/2022</completiondate>
    <lettingdate>04/21/2021</lettingdate>
    <contractor>Digesare Mechanical</contractor>
    <contractno>TAA 21-5A/D214793</contractno>
    <contractno>TAA 21-5A/D214793</contractno>
    <division>Albany</division>
    <id>A368.2</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-74.31555</longitude>
    <latitude>42.932238</latitude>
    <locationdescription>AURIES CREEK BRIDGE</locationdescription>
    <numlocations>5</numlocations>
    <constructionamount>$2,985,000.00</constructionamount>
    <description>Scour Repairs at Various Bridges (MP 165.10, 171.31, 174.71, 179.76 &amp; 185.93)</description>
    <completiondate>10/11/2024</completiondate>
    <lettingdate>01/10/2024</lettingdate>
    <contractor>James H Malloy Inc</contractor>
    <contractno>TAA 24-6B/D214960</contractno>
    <contractno>TAA 24-6B/D214960</contractno>
    <division>Albany</division>
    <id>B221.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-74.423879</longitude>
    <latitude>42.926754</latitude>
    <locationdescription>VAN WIE CREEK BRIDGE</locationdescription>
    <numlocations>5</numlocations>
    <constructionamount>$2,985,000.00</constructionamount>
    <description>Scour Repairs at Various Bridges (MP 165.10, 171.31, 174.71, 179.76 &amp; 185.93)</description>
    <completiondate>10/11/2024</completiondate>
    <lettingdate>01/10/2024</lettingdate>
    <contractor>James H Malloy Inc</contractor>
    <contractno>TAA 24-6B/D214960</contractno>
    <contractno>TAA 24-6B/D214960</contractno>
    <division>Albany</division>
    <id>B221.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-74.047829</longitude>
    <latitude>42.870766</latitude>
    <locationdescription>RESERVOIR CREEK &amp; RD. BRIDGE</locationdescription>
    <numlocations>5</numlocations>
    <constructionamount>$2,985,000.00</constructionamount>
    <description>Scour Repairs at Various Bridges (MP 165.10, 171.31, 174.71, 179.76 &amp; 185.93)</description>
    <completiondate>10/11/2024</completiondate>
    <lettingdate>01/10/2024</lettingdate>
    <contractor>James H Malloy Inc</contractor>
    <contractno>TAA 24-6B/D214960</contractno>
    <contractno>TAA 24-6B/D214960</contractno>
    <division>Albany</division>
    <id>B221.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-74.217737</longitude>
    <latitude>42.92754</latitude>
    <locationdescription>CHUCTANUNDA CREEK BRIDGE</locationdescription>
    <numlocations>5</numlocations>
    <constructionamount>$2,985,000.00</constructionamount>
    <description>Scour Repairs at Various Bridges (MP 165.10, 171.31, 174.71, 179.76 &amp; 185.93)</description>
    <completiondate>10/11/2024</completiondate>
    <lettingdate>01/10/2024</lettingdate>
    <contractor>James H Malloy Inc</contractor>
    <contractno>TAA 24-6B/D214960</contractno>
    <contractno>TAA 24-6B/D214960</contractno>
    <division>Albany</division>
    <id>B221.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-74.153629</longitude>
    <latitude>42.913095</latitude>
    <locationdescription>TERWILLEGER CREEK BRIDGE</locationdescription>
    <numlocations>5</numlocations>
    <constructionamount>$2,985,000.00</constructionamount>
    <description>Scour Repairs at Various Bridges (MP 165.10, 171.31, 174.71, 179.76 &amp; 185.93)</description>
    <completiondate>10/11/2024</completiondate>
    <lettingdate>01/10/2024</lettingdate>
    <contractor>James H Malloy Inc</contractor>
    <contractno>TAA 24-6B/D214960</contractno>
    <contractno>TAA 24-6B/D214960</contractno>
    <division>Albany</division>
    <id>B221.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-75.213258</longitude>
    <latitude>43.11415</latitude>
    <locationdescription>N. GENESEE ST. (RAMP) BRIDGE</locationdescription>
    <numlocations>1</numlocations>
    <constructionamount>$2,730,375.17</constructionamount>
    <description>Rehabilitation of North Genesee St. Bridge at MP 233.27 (away bridge)</description>
    <completiondate>12/30/2025</completiondate>
    <lettingdate>02/19/2025</lettingdate>
    <contractor>Vector Construction Corp</contractor>
    <contractno>TAS 25-5B/D215007</contractno>
    <contractno>TAS 25-5B/D215007</contractno>
    <division>Syracuse</division>
    <id>B223.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.901582</longitude>
    <latitude>42.236328</latitude>
    <locationdescription>LEEDS-OLD KINGS HWY. BRIDGE</locationdescription>
    <numlocations>1</numlocations>
    <constructionamount>$7,562,321.70</constructionamount>
    <description>Replacement of the Cauterskill Road Bridge over the Thruway</description>
    <completiondate>11/21/2024</completiondate>
    <lettingdate>08/02/2023</lettingdate>
    <contractor />
    <contractno>TAA 23-21B/D214929</contractno>
    <contractno>TAA 23-21B/D214929</contractno>
    <division>Albany</division>
    <id>B346.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-76.08976</longitude>
    <latitude>43.092834</latitude>
    <locationdescription>SYRACUSE INTERCHANGE BRIDGE</locationdescription>
    <numlocations>1</numlocations>
    <constructionamount>$8,178,718.00</constructionamount>
    <description>Syracuse Interchange (Exit 35) Bridge Over Thruway - Replacement</description>
    <completiondate>08/11/2023</completiondate>
    <lettingdate>03/30/2022</lettingdate>
    <contractor>ECONOMY PAVING CO INC</contractor>
    <contractno>TAS 22-11B/D214863</contractno>
    <contractno>TAS 22-11B/D214863</contractno>
    <division>Syracuse</division>
    <id>B413.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-78.948275</longitude>
    <latitude>43.005</latitude>
    <locationdescription>BEAVER ISLAND PKWY BRIDGE</locationdescription>
    <numlocations>1</numlocations>
    <constructionamount>$8,327,640.25</constructionamount>
    <description>Beaver Island State Parkway Bridge over I-190 Thruway: Replacement</description>
    <completiondate>12/01/2023</completiondate>
    <lettingdate>10/26/2022</lettingdate>
    <contractor>UNION CONCRETE AND CONSTRUCTION CORPORATION</contractor>
    <contractno>TAN 22-26B/D214894</contractno>
    <contractno>TAN 22-26B/D214894</contractno>
    <division>Buffalo</division>
    <id>B558.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-75.078878</longitude>
    <latitude>43.062214</latitude>
    <locationdescription>CO RD 53 (EB) BRIDGE</locationdescription>
    <numlocations>2</numlocations>
    <constructionamount>$5,887,872.00</constructionamount>
    <description>Thruway Bridges over County Road 53: Replacements</description>
    <completiondate>11/17/2023</completiondate>
    <lettingdate>11/10/2021</lettingdate>
    <contractor>Bette &amp; Cring, LLC.</contractor>
    <contractno>TAS 21-23B/D214859</contractno>
    <contractno>TAS 21-23B/D214859</contractno>
    <division>Syracuse</division>
    <id>B571.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-75.07865</longitude>
    <latitude>43.062426</latitude>
    <locationdescription>CO RD 53 (WB) BRIDGE</locationdescription>
    <numlocations>2</numlocations>
    <constructionamount>$5,887,872.00</constructionamount>
    <description>Thruway Bridges over County Road 53: Replacements</description>
    <completiondate>11/17/2023</completiondate>
    <lettingdate>11/10/2021</lettingdate>
    <contractor>Bette &amp; Cring, LLC.</contractor>
    <contractno>TAS 21-23B/D214859</contractno>
    <contractno>TAS 21-23B/D214859</contractno>
    <division>Syracuse</division>
    <id>B571.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-74.079512</longitude>
    <latitude>41.485992</latitude>
    <locationdescription>NEWBURGH-CAMBELL HALL RT207 BRIDGE</locationdescription>
    <numlocations>1</numlocations>
    <constructionamount>$15,872,158.72</constructionamount>
    <description>Thruway Bridge over Newburgh-Cambell Hall Road (Route 207): Replacement</description>
    <completiondate>07/31/2022</completiondate>
    <lettingdate>12/11/2019</lettingdate>
    <contractor>Harrison &amp; Burrowes Bridge Constructors, Inc.</contractor>
    <contractno>TANY 19-29B/D214742</contractno>
    <contractno>TANY 19-29B/D214742</contractno>
    <division>New York</division>
    <id>B583.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-79.592637</longitude>
    <latitude>42.332896</latitude>
    <locationdescription>CHAUTAUQUA CREEK (EB) BRIDGE</locationdescription>
    <numlocations>3</numlocations>
    <constructionamount>$1,931,535.00</constructionamount>
    <description>Chautauqua Creek (Eastbound &amp; Westbound) and Hawley Street Bridges: Rehabilitations</description>
    <completiondate>11/18/2022</completiondate>
    <lettingdate>03/16/2022</lettingdate>
    <contractor>JAGD Construction</contractor>
    <contractno>TAB 22-16B/D214871</contractno>
    <contractno>TAB 22-16B/D214871</contractno>
    <division>Buffalo</division>
    <id>B668.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-79.59652</longitude>
    <latitude>42.330697</latitude>
    <locationdescription>HAWLEY STREET BRIDGE</locationdescription>
    <numlocations>3</numlocations>
    <constructionamount>$1,931,535.00</constructionamount>
    <description>Chautauqua Creek (Eastbound &amp; Westbound) and Hawley Street Bridges: Rehabilitations</description>
    <completiondate>11/18/2022</completiondate>
    <lettingdate>03/16/2022</lettingdate>
    <contractor>JAGD Construction</contractor>
    <contractno>TAB 22-16B/D214871</contractno>
    <contractno>TAB 22-16B/D214871</contractno>
    <division>Buffalo</division>
    <id>B668.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-79.592855</longitude>
    <latitude>42.33315</latitude>
    <locationdescription>CHAUTAUQUA CREEK (WB) BRIDGE</locationdescription>
    <numlocations>3</numlocations>
    <constructionamount>$1,931,535.00</constructionamount>
    <description>Chautauqua Creek (Eastbound &amp; Westbound) and Hawley Street Bridges: Rehabilitations</description>
    <completiondate>11/18/2022</completiondate>
    <lettingdate>03/16/2022</lettingdate>
    <contractor>JAGD Construction</contractor>
    <contractno>TAB 22-16B/D214871</contractno>
    <contractno>TAB 22-16B/D214871</contractno>
    <division>Buffalo</division>
    <id>B668.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-79.346326</longitude>
    <latitude>42.458926</latitude>
    <locationdescription>BRIGHAM ROAD (CR 98B) BRIDGE</locationdescription>
    <numlocations>4</numlocations>
    <constructionamount>$2,479,613.76</constructionamount>
    <description>Buffalo Division: Bridge Painting at Various Locations</description>
    <completiondate>06/26/2024</completiondate>
    <lettingdate>07/19/2023</lettingdate>
    <contractor>JAG'D Construction Inc.</contractor>
    <contractno>TAB 23-20BP/D214926</contractno>
    <contractno>TAB 23-20BP/D214926</contractno>
    <division>Buffalo</division>
    <id>B679.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-79.143636</longitude>
    <latitude>42.523184</latitude>
    <locationdescription>HANOVER-HANFORD RDS. BRIDGE</locationdescription>
    <numlocations>4</numlocations>
    <constructionamount>$2,479,613.76</constructionamount>
    <description>Buffalo Division: Bridge Painting at Various Locations</description>
    <completiondate>06/26/2024</completiondate>
    <lettingdate>07/19/2023</lettingdate>
    <contractor>JAG'D Construction Inc.</contractor>
    <contractno>TAB 23-20BP/D214926</contractno>
    <contractno>TAB 23-20BP/D214926</contractno>
    <division>Buffalo</division>
    <id>B679.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-78.998029</longitude>
    <latitude>42.628437</latitude>
    <locationdescription>PONTIAC ROAD BRIDGE</locationdescription>
    <numlocations>4</numlocations>
    <constructionamount>$2,479,613.76</constructionamount>
    <description>Buffalo Division: Bridge Painting at Various Locations</description>
    <completiondate>06/26/2024</completiondate>
    <lettingdate>07/19/2023</lettingdate>
    <contractor>JAG'D Construction Inc.</contractor>
    <contractno>TAB 23-20BP/D214926</contractno>
    <contractno>TAB 23-20BP/D214926</contractno>
    <division>Buffalo</division>
    <id>B679.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-79.293995</longitude>
    <latitude>42.465252</latitude>
    <locationdescription>SOUTH ROBERTS ROAD (CR 136) BRIDGE</locationdescription>
    <numlocations>4</numlocations>
    <constructionamount>$2,479,613.76</constructionamount>
    <description>Buffalo Division: Bridge Painting at Various Locations</description>
    <completiondate>06/26/2024</completiondate>
    <lettingdate>07/19/2023</lettingdate>
    <contractor>JAG'D Construction Inc.</contractor>
    <contractno>TAB 23-20BP/D214926</contractno>
    <contractno>TAB 23-20BP/D214926</contractno>
    <division>Buffalo</division>
    <id>B679.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-74.16057</longitude>
    <latitude>41.11935</latitude>
    <locationdescription>RAMAPO RIVER BRIDGE</locationdescription>
    <numlocations>2</numlocations>
    <constructionamount>$2,485,485.52</constructionamount>
    <description>Bridge Scour Repairs at MP 84.14 &amp; MP 30.23</description>
    <completiondate>11/30/2022</completiondate>
    <lettingdate>07/28/2021</lettingdate>
    <contractor>Harrison &amp; Burrowes Bridge Contractors, Inc.</contractor>
    <contractno>TA 21-15B/D214791</contractno>
    <contractno>TA 21-15B/D214791</contractno>
    <division>Albany</division>
    <id>B686.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-74.05938</longitude>
    <latitude>41.852345</latitude>
    <locationdescription>RONDOUT CREEK BRIDGE</locationdescription>
    <numlocations>2</numlocations>
    <constructionamount>$2,485,485.52</constructionamount>
    <description>Bridge Scour Repairs at MP 84.14 &amp; MP 30.23</description>
    <completiondate>11/30/2022</completiondate>
    <lettingdate>07/28/2021</lettingdate>
    <contractor>Harrison &amp; Burrowes Bridge Contractors, Inc.</contractor>
    <contractno>TA 21-15B/D214791</contractno>
    <contractno>TA 21-15B/D214791</contractno>
    <division>Albany</division>
    <id>B686.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.531868</longitude>
    <latitude>42.409088</latitude>
    <locationdescription>ROUTE 295 BRIDGE</locationdescription>
    <numlocations>1</numlocations>
    <constructionamount>$823,903.66</constructionamount>
    <description>MP 816.26: Route 295 Bridge - Steel Repairs</description>
    <completiondate>11/05/2021</completiondate>
    <lettingdate>09/30/2020</lettingdate>
    <contractor>DA Collins Construction Co, Inc.</contractor>
    <contractno>TABS 20-9B/D214785</contractno>
    <contractno>TABS 20-9B/D214785</contractno>
    <division>Albany</division>
    <id>B687.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-75.344868</longitude>
    <latitude>43.127302</latitude>
    <locationdescription>JUDD ROAD BRIDGE</locationdescription>
    <numlocations>1</numlocations>
    <constructionamount>$4,843,934.80</constructionamount>
    <description>Judd Road Bridge over Thruway - Replacement</description>
    <completiondate>11/18/2022</completiondate>
    <lettingdate>02/16/2022</lettingdate>
    <contractor>Tioga Construction Company, Inc.</contractor>
    <contractno>TAS 22-8B/D214860</contractno>
    <contractno>TAS 22-8B/D214860</contractno>
    <division>Syracuse</division>
    <id>B690.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.893585</longitude>
    <latitude>42.242804</latitude>
    <locationdescription>ML - MP: 113.22</locationdescription>
    <numlocations>1</numlocations>
    <constructionamount>$1,710,115.00</constructionamount>
    <description>MP 113.22: Catskill Creek Slope Stabilization</description>
    <completiondate>12/31/2021</completiondate>
    <lettingdate>12/23/2020</lettingdate>
    <contractor>Rifenburg Construction, Inc.</contractor>
    <contractno>TAA 20-13B/D214719</contractno>
    <contractno>TAA 20-13B/D214719</contractno>
    <division>Albany</division>
    <id>B725.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-74.128398</longitude>
    <latitude>41.119893</latitude>
    <locationdescription>HEMION ROAD BRIDGE</locationdescription>
    <numlocations>23</numlocations>
    <constructionamount>$6,313,000.00</constructionamount>
    <description>New York Division Joint Replacements on Various Bridges - 2019</description>
    <completiondate>11/09/2021</completiondate>
    <lettingdate>04/24/2019</lettingdate>
    <contractor>HVB Construction Enterprises, Inc.</contractor>
    <contractno>TANY 19-10B/D214716</contractno>
    <contractno>TANY 19-10B/D214716</contractno>
    <division>New York</division>
    <id>B729.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-74.076903</longitude>
    <latitude>41.104041</latitude>
    <locationdescription>ERIE RR (SB) BRIDGE</locationdescription>
    <numlocations>23</numlocations>
    <constructionamount>$6,313,000.00</constructionamount>
    <description>New York Division Joint Replacements on Various Bridges - 2019</description>
    <completiondate>11/09/2021</completiondate>
    <lettingdate>04/24/2019</lettingdate>
    <contractor>HVB Construction Enterprises, Inc.</contractor>
    <contractno>TANY 19-10B/D214716</contractno>
    <contractno>TANY 19-10B/D214716</contractno>
    <division>New York</division>
    <id>B729.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.856702</longitude>
    <latitude>40.931501</latitude>
    <locationdescription>CROSS COUNTY PARKWAY BRIDGE</locationdescription>
    <numlocations>23</numlocations>
    <constructionamount>$6,313,000.00</constructionamount>
    <description>New York Division Joint Replacements on Various Bridges - 2019</description>
    <completiondate>11/09/2021</completiondate>
    <lettingdate>04/24/2019</lettingdate>
    <contractor>HVB Construction Enterprises, Inc.</contractor>
    <contractno>TANY 19-10B/D214716</contractno>
    <contractno>TANY 19-10B/D214716</contractno>
    <division>New York</division>
    <id>B729.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-74.074388</longitude>
    <latitude>41.522147</latitude>
    <locationdescription>MEADOW HILL ROAD BRIDGE</locationdescription>
    <numlocations>23</numlocations>
    <constructionamount>$6,313,000.00</constructionamount>
    <description>New York Division Joint Replacements on Various Bridges - 2019</description>
    <completiondate>11/09/2021</completiondate>
    <lettingdate>04/24/2019</lettingdate>
    <contractor>HVB Construction Enterprises, Inc.</contractor>
    <contractno>TANY 19-10B/D214716</contractno>
    <contractno>TANY 19-10B/D214716</contractno>
    <division>New York</division>
    <id>B729.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-74.040329</longitude>
    <latitude>41.097602</latitude>
    <locationdescription>GARDEN STATE PARKWAY CONN. BRIDGE</locationdescription>
    <numlocations>23</numlocations>
    <constructionamount>$6,313,000.00</constructionamount>
    <description>New York Division Joint Replacements on Various Bridges - 2019</description>
    <completiondate>11/09/2021</completiondate>
    <lettingdate>04/24/2019</lettingdate>
    <contractor>HVB Construction Enterprises, Inc.</contractor>
    <contractno>TANY 19-10B/D214716</contractno>
    <contractno>TANY 19-10B/D214716</contractno>
    <division>New York</division>
    <id>B729.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.923248</longitude>
    <latitude>41.082221</latitude>
    <locationdescription>SO. NYACK INTERCHANGE BRIDGE</locationdescription>
    <numlocations>23</numlocations>
    <constructionamount>$6,313,000.00</constructionamount>
    <description>New York Division Joint Replacements on Various Bridges - 2019</description>
    <completiondate>11/09/2021</completiondate>
    <lettingdate>04/24/2019</lettingdate>
    <contractor>HVB Construction Enterprises, Inc.</contractor>
    <contractno>TANY 19-10B/D214716</contractno>
    <contractno>TANY 19-10B/D214716</contractno>
    <division>New York</division>
    <id>B729.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.931157</longitude>
    <latitude>41.093044</latitude>
    <locationdescription>MAIN ST. RT. 59 BRIDGE</locationdescription>
    <numlocations>23</numlocations>
    <constructionamount>$6,313,000.00</constructionamount>
    <description>New York Division Joint Replacements on Various Bridges - 2019</description>
    <completiondate>11/09/2021</completiondate>
    <lettingdate>04/24/2019</lettingdate>
    <contractor>HVB Construction Enterprises, Inc.</contractor>
    <contractno>TANY 19-10B/D214716</contractno>
    <contractno>TANY 19-10B/D214716</contractno>
    <division>New York</division>
    <id>B729.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-74.078356</longitude>
    <latitude>41.661258</latitude>
    <locationdescription>FREETOWN ROAD BRIDGE</locationdescription>
    <numlocations>23</numlocations>
    <constructionamount>$6,313,000.00</constructionamount>
    <description>New York Division Joint Replacements on Various Bridges - 2019</description>
    <completiondate>11/09/2021</completiondate>
    <lettingdate>04/24/2019</lettingdate>
    <contractor>HVB Construction Enterprises, Inc.</contractor>
    <contractno>TANY 19-10B/D214716</contractno>
    <contractno>TANY 19-10B/D214716</contractno>
    <division>New York</division>
    <id>B729.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-74.156044</longitude>
    <latitude>41.117697</latitude>
    <locationdescription>SUFFERN INTERCHANGE (RAMP B) BRIDGE</locationdescription>
    <numlocations>23</numlocations>
    <constructionamount>$6,313,000.00</constructionamount>
    <description>New York Division Joint Replacements on Various Bridges - 2019</description>
    <completiondate>11/09/2021</completiondate>
    <lettingdate>04/24/2019</lettingdate>
    <contractor>HVB Construction Enterprises, Inc.</contractor>
    <contractno>TANY 19-10B/D214716</contractno>
    <contractno>TANY 19-10B/D214716</contractno>
    <division>New York</division>
    <id>B729.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-74.181454</longitude>
    <latitude>41.143307</latitude>
    <locationdescription>TANDEM TRUCK ACCESS BRIDGE BRIDGE</locationdescription>
    <numlocations>23</numlocations>
    <constructionamount>$6,313,000.00</constructionamount>
    <description>New York Division Joint Replacements on Various Bridges - 2019</description>
    <completiondate>11/09/2021</completiondate>
    <lettingdate>04/24/2019</lettingdate>
    <contractor>HVB Construction Enterprises, Inc.</contractor>
    <contractno>TANY 19-10B/D214716</contractno>
    <contractno>TANY 19-10B/D214716</contractno>
    <division>New York</division>
    <id>B729.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-74.181201</longitude>
    <latitude>41.228014</latitude>
    <locationdescription>SEVEN LAKES DR.RT. 210 (NB) BRIDGE</locationdescription>
    <numlocations>23</numlocations>
    <constructionamount>$6,313,000.00</constructionamount>
    <description>New York Division Joint Replacements on Various Bridges - 2019</description>
    <completiondate>11/09/2021</completiondate>
    <lettingdate>04/24/2019</lettingdate>
    <contractor>HVB Construction Enterprises, Inc.</contractor>
    <contractno>TANY 19-10B/D214716</contractno>
    <contractno>TANY 19-10B/D214716</contractno>
    <division>New York</division>
    <id>B729.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-74.076755</longitude>
    <latitude>41.104189</latitude>
    <locationdescription>ERIE RR (NB) BRIDGE</locationdescription>
    <numlocations>23</numlocations>
    <constructionamount>$6,313,000.00</constructionamount>
    <description>New York Division Joint Replacements on Various Bridges - 2019</description>
    <completiondate>11/09/2021</completiondate>
    <lettingdate>04/24/2019</lettingdate>
    <contractor>HVB Construction Enterprises, Inc.</contractor>
    <contractno>TANY 19-10B/D214716</contractno>
    <contractno>TANY 19-10B/D214716</contractno>
    <division>New York</division>
    <id>B729.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-74.160606</longitude>
    <latitude>41.118616</latitude>
    <locationdescription>SUFFERN INTERCHANGE RAMP C BRIDGE</locationdescription>
    <numlocations>23</numlocations>
    <constructionamount>$6,313,000.00</constructionamount>
    <description>New York Division Joint Replacements on Various Bridges - 2019</description>
    <completiondate>11/09/2021</completiondate>
    <lettingdate>04/24/2019</lettingdate>
    <contractor>HVB Construction Enterprises, Inc.</contractor>
    <contractno>TANY 19-10B/D214716</contractno>
    <contractno>TANY 19-10B/D214716</contractno>
    <division>New York</division>
    <id>B729.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.948459</longitude>
    <latitude>41.098921</latitude>
    <locationdescription>HACKENSACK RIVER BRIDGE</locationdescription>
    <numlocations>23</numlocations>
    <constructionamount>$6,313,000.00</constructionamount>
    <description>New York Division Joint Replacements on Various Bridges - 2019</description>
    <completiondate>11/09/2021</completiondate>
    <lettingdate>04/24/2019</lettingdate>
    <contractor>HVB Construction Enterprises, Inc.</contractor>
    <contractno>TANY 19-10B/D214716</contractno>
    <contractno>TANY 19-10B/D214716</contractno>
    <division>New York</division>
    <id>B729.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.951336</longitude>
    <latitude>41.099709</latitude>
    <locationdescription>NJ STATE L.-CONGERS RT.303 BRIDGE</locationdescription>
    <numlocations>23</numlocations>
    <constructionamount>$6,313,000.00</constructionamount>
    <description>New York Division Joint Replacements on Various Bridges - 2019</description>
    <completiondate>11/09/2021</completiondate>
    <lettingdate>04/24/2019</lettingdate>
    <contractor>HVB Construction Enterprises, Inc.</contractor>
    <contractno>TANY 19-10B/D214716</contractno>
    <contractno>TANY 19-10B/D214716</contractno>
    <division>New York</division>
    <id>B729.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.86109</longitude>
    <latitude>40.955334</latitude>
    <locationdescription>TUCKAHOE ROAD BRIDGE</locationdescription>
    <numlocations>23</numlocations>
    <constructionamount>$6,313,000.00</constructionamount>
    <description>New York Division Joint Replacements on Various Bridges - 2019</description>
    <completiondate>11/09/2021</completiondate>
    <lettingdate>04/24/2019</lettingdate>
    <contractor>HVB Construction Enterprises, Inc.</contractor>
    <contractno>TANY 19-10B/D214716</contractno>
    <contractno>TANY 19-10B/D214716</contractno>
    <division>New York</division>
    <id>B729.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.972802</longitude>
    <latitude>41.101042</latitude>
    <locationdescription>STRAWTOWN ROAD BRIDGE</locationdescription>
    <numlocations>23</numlocations>
    <constructionamount>$6,313,000.00</constructionamount>
    <description>New York Division Joint Replacements on Various Bridges - 2019</description>
    <completiondate>11/09/2021</completiondate>
    <lettingdate>04/24/2019</lettingdate>
    <contractor>HVB Construction Enterprises, Inc.</contractor>
    <contractno>TANY 19-10B/D214716</contractno>
    <contractno>TANY 19-10B/D214716</contractno>
    <division>New York</division>
    <id>B729.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.850871</longitude>
    <latitude>41.009105</latitude>
    <locationdescription>SAW MILL RIVER RD. RT. 9A BRIDGE</locationdescription>
    <numlocations>23</numlocations>
    <constructionamount>$6,313,000.00</constructionamount>
    <description>New York Division Joint Replacements on Various Bridges - 2019</description>
    <completiondate>11/09/2021</completiondate>
    <lettingdate>04/24/2019</lettingdate>
    <contractor>HVB Construction Enterprises, Inc.</contractor>
    <contractno>TANY 19-10B/D214716</contractno>
    <contractno>TANY 19-10B/D214716</contractno>
    <division>New York</division>
    <id>B729.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-74.077021</longitude>
    <latitude>41.409288</latitude>
    <locationdescription>MOODNA CREEK BRIDGE</locationdescription>
    <numlocations>23</numlocations>
    <constructionamount>$6,313,000.00</constructionamount>
    <description>New York Division Joint Replacements on Various Bridges - 2019</description>
    <completiondate>11/09/2021</completiondate>
    <lettingdate>04/24/2019</lettingdate>
    <contractor>HVB Construction Enterprises, Inc.</contractor>
    <contractno>TANY 19-10B/D214716</contractno>
    <contractno>TANY 19-10B/D214716</contractno>
    <division>New York</division>
    <id>B729.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-74.047812</longitude>
    <latitude>41.096891</latitude>
    <locationdescription>MAIN ST. RT. 45 BRIDGE</locationdescription>
    <numlocations>23</numlocations>
    <constructionamount>$6,313,000.00</constructionamount>
    <description>New York Division Joint Replacements on Various Bridges - 2019</description>
    <completiondate>11/09/2021</completiondate>
    <lettingdate>04/24/2019</lettingdate>
    <contractor>HVB Construction Enterprises, Inc.</contractor>
    <contractno>TANY 19-10B/D214716</contractno>
    <contractno>TANY 19-10B/D214716</contractno>
    <division>New York</division>
    <id>B729.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-74.181747</longitude>
    <latitude>41.227949</latitude>
    <locationdescription>SEVEN LAKES DR.RT. 210 (SB) BRIDGE</locationdescription>
    <numlocations>23</numlocations>
    <constructionamount>$6,313,000.00</constructionamount>
    <description>New York Division Joint Replacements on Various Bridges - 2019</description>
    <completiondate>11/09/2021</completiondate>
    <lettingdate>04/24/2019</lettingdate>
    <contractor>HVB Construction Enterprises, Inc.</contractor>
    <contractno>TANY 19-10B/D214716</contractno>
    <contractno>TANY 19-10B/D214716</contractno>
    <division>New York</division>
    <id>B729.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-74.112845</longitude>
    <latitude>41.116387</latitude>
    <locationdescription>AIRMONT ROAD (EB) BRIDGE</locationdescription>
    <numlocations>23</numlocations>
    <constructionamount>$6,313,000.00</constructionamount>
    <description>New York Division Joint Replacements on Various Bridges - 2019</description>
    <completiondate>11/09/2021</completiondate>
    <lettingdate>04/24/2019</lettingdate>
    <contractor>HVB Construction Enterprises, Inc.</contractor>
    <contractno>TANY 19-10B/D214716</contractno>
    <contractno>TANY 19-10B/D214716</contractno>
    <division>New York</division>
    <id>B729.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-74.170226</longitude>
    <latitude>41.139698</latitude>
    <locationdescription>ERIE RR RT.17 RAMAPO R.(NB) BRIDGE</locationdescription>
    <numlocations>23</numlocations>
    <constructionamount>$6,313,000.00</constructionamount>
    <description>New York Division Joint Replacements on Various Bridges - 2019</description>
    <completiondate>11/09/2021</completiondate>
    <lettingdate>04/24/2019</lettingdate>
    <contractor>HVB Construction Enterprises, Inc.</contractor>
    <contractno>TANY 19-10B/D214716</contractno>
    <contractno>TANY 19-10B/D214716</contractno>
    <division>New York</division>
    <id>B729.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-78.680916</longitude>
    <latitude>42.948075</latitude>
    <locationdescription>N.Y.C.R.R. (WEST SHORE) BRIDGE</locationdescription>
    <numlocations>19</numlocations>
    <constructionamount>$5,901,071.14</constructionamount>
    <description>Eastern Buffalo Division Joint Replacement on 19 Bridges</description>
    <completiondate>09/24/2021</completiondate>
    <lettingdate>04/17/2019</lettingdate>
    <contractor>Nichols Long &amp; Moore Construction Corporation</contractor>
    <contractno>TAB 19-23B/D214731</contractno>
    <contractno>TAB 19-23B/D214731</contractno>
    <division>Buffalo</division>
    <id>B729.2</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-78.766478</longitude>
    <latitude>42.914763</latitude>
    <locationdescription>W. SHORE RR &amp; SCAJAQUADA CR BRIDGE</locationdescription>
    <numlocations>19</numlocations>
    <constructionamount>$5,901,071.14</constructionamount>
    <description>Eastern Buffalo Division Joint Replacement on 19 Bridges</description>
    <completiondate>09/24/2021</completiondate>
    <lettingdate>04/17/2019</lettingdate>
    <contractor>Nichols Long &amp; Moore Construction Corporation</contractor>
    <contractno>TAB 19-23B/D214731</contractno>
    <contractno>TAB 19-23B/D214731</contractno>
    <division>Buffalo</division>
    <id>B729.2</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-78.703359</longitude>
    <latitude>42.950484</latitude>
    <locationdescription>DEPEW INTERCHANGE BRIDGE</locationdescription>
    <numlocations>19</numlocations>
    <constructionamount>$5,901,071.14</constructionamount>
    <description>Eastern Buffalo Division Joint Replacement on 19 Bridges</description>
    <completiondate>09/24/2021</completiondate>
    <lettingdate>04/17/2019</lettingdate>
    <contractor>Nichols Long &amp; Moore Construction Corporation</contractor>
    <contractno>TAB 19-23B/D214731</contractno>
    <contractno>TAB 19-23B/D214731</contractno>
    <division>Buffalo</division>
    <id>B729.2</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-78.873405</longitude>
    <latitude>42.877357</latitude>
    <locationdescription>RAMP "Y" SB WASHINGTON ST. BRIDGE</locationdescription>
    <numlocations>19</numlocations>
    <constructionamount>$5,901,071.14</constructionamount>
    <description>Eastern Buffalo Division Joint Replacement on 19 Bridges</description>
    <completiondate>09/24/2021</completiondate>
    <lettingdate>04/17/2019</lettingdate>
    <contractor>Nichols Long &amp; Moore Construction Corporation</contractor>
    <contractno>TAB 19-23B/D214731</contractno>
    <contractno>TAB 19-23B/D214731</contractno>
    <division>Buffalo</division>
    <id>B729.2</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-78.877788</longitude>
    <latitude>42.879475</latitude>
    <locationdescription>NIAGARA VIADUCT BRIDGE</locationdescription>
    <numlocations>19</numlocations>
    <constructionamount>$5,901,071.14</constructionamount>
    <description>Eastern Buffalo Division Joint Replacement on 19 Bridges</description>
    <completiondate>09/24/2021</completiondate>
    <lettingdate>04/17/2019</lettingdate>
    <contractor>Nichols Long &amp; Moore Construction Corporation</contractor>
    <contractno>TAB 19-23B/D214731</contractno>
    <contractno>TAB 19-23B/D214731</contractno>
    <division>Buffalo</division>
    <id>B729.2</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-78.900626</longitude>
    <latitude>42.902394</latitude>
    <locationdescription>NYCRR (NIAG. ST. RAMPS SB) BRIDGE</locationdescription>
    <numlocations>19</numlocations>
    <constructionamount>$5,901,071.14</constructionamount>
    <description>Eastern Buffalo Division Joint Replacement on 19 Bridges</description>
    <completiondate>09/24/2021</completiondate>
    <lettingdate>04/17/2019</lettingdate>
    <contractor>Nichols Long &amp; Moore Construction Corporation</contractor>
    <contractno>TAB 19-23B/D214731</contractno>
    <contractno>TAB 19-23B/D214731</contractno>
    <division>Buffalo</division>
    <id>B729.2</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-78.921301</longitude>
    <latitude>42.964658</latitude>
    <locationdescription>RIVER ROAD (ENTRANCE) BRIDGE</locationdescription>
    <numlocations>19</numlocations>
    <constructionamount>$5,901,071.14</constructionamount>
    <description>Eastern Buffalo Division Joint Replacement on 19 Bridges</description>
    <completiondate>09/24/2021</completiondate>
    <lettingdate>04/17/2019</lettingdate>
    <contractor>Nichols Long &amp; Moore Construction Corporation</contractor>
    <contractno>TAB 19-23B/D214731</contractno>
    <contractno>TAB 19-23B/D214731</contractno>
    <division>Buffalo</division>
    <id>B729.2</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-78.904234</longitude>
    <latitude>42.935954</latitude>
    <locationdescription>HAMILTON ST. BRIDGE</locationdescription>
    <numlocations>19</numlocations>
    <constructionamount>$5,901,071.14</constructionamount>
    <description>Eastern Buffalo Division Joint Replacement on 19 Bridges</description>
    <completiondate>09/24/2021</completiondate>
    <lettingdate>04/17/2019</lettingdate>
    <contractor>Nichols Long &amp; Moore Construction Corporation</contractor>
    <contractno>TAB 19-23B/D214731</contractno>
    <contractno>TAB 19-23B/D214731</contractno>
    <division>Buffalo</division>
    <id>B729.2</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-78.759336</longitude>
    <latitude>42.951505</latitude>
    <locationdescription>FOREST ROAD BRIDGE</locationdescription>
    <numlocations>19</numlocations>
    <constructionamount>$5,901,071.14</constructionamount>
    <description>Eastern Buffalo Division Joint Replacement on 19 Bridges</description>
    <completiondate>09/24/2021</completiondate>
    <lettingdate>04/17/2019</lettingdate>
    <contractor>Nichols Long &amp; Moore Construction Corporation</contractor>
    <contractno>TAB 19-23B/D214731</contractno>
    <contractno>TAB 19-23B/D214731</contractno>
    <division>Buffalo</division>
    <id>B729.2</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-78.873486</longitude>
    <latitude>42.878106</latitude>
    <locationdescription>RAMP "X" NB OAK ST TO TWY BRIDGE</locationdescription>
    <numlocations>19</numlocations>
    <constructionamount>$5,901,071.14</constructionamount>
    <description>Eastern Buffalo Division Joint Replacement on 19 Bridges</description>
    <completiondate>09/24/2021</completiondate>
    <lettingdate>04/17/2019</lettingdate>
    <contractor>Nichols Long &amp; Moore Construction Corporation</contractor>
    <contractno>TAB 19-23B/D214731</contractno>
    <contractno>TAB 19-23B/D214731</contractno>
    <division>Buffalo</division>
    <id>B729.2</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-78.186124</longitude>
    <latitude>43.018746</latitude>
    <locationdescription>BATAVIA INTER. BRIDGE</locationdescription>
    <numlocations>19</numlocations>
    <constructionamount>$5,901,071.14</constructionamount>
    <description>Eastern Buffalo Division Joint Replacement on 19 Bridges</description>
    <completiondate>09/24/2021</completiondate>
    <lettingdate>04/17/2019</lettingdate>
    <contractor>Nichols Long &amp; Moore Construction Corporation</contractor>
    <contractno>TAB 19-23B/D214731</contractno>
    <contractno>TAB 19-23B/D214731</contractno>
    <division>Buffalo</division>
    <id>B729.2</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-78.427276</longitude>
    <latitude>42.995112</latitude>
    <locationdescription>ROUTE 5 BRIDGE</locationdescription>
    <numlocations>19</numlocations>
    <constructionamount>$5,901,071.14</constructionamount>
    <description>Eastern Buffalo Division Joint Replacement on 19 Bridges</description>
    <completiondate>09/24/2021</completiondate>
    <lettingdate>04/17/2019</lettingdate>
    <contractor>Nichols Long &amp; Moore Construction Corporation</contractor>
    <contractno>TAB 19-23B/D214731</contractno>
    <contractno>TAB 19-23B/D214731</contractno>
    <division>Buffalo</division>
    <id>B729.2</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-78.901499</longitude>
    <latitude>42.915184</latitude>
    <locationdescription>WEST FERRY STREET BRIDGE</locationdescription>
    <numlocations>19</numlocations>
    <constructionamount>$5,901,071.14</constructionamount>
    <description>Eastern Buffalo Division Joint Replacement on 19 Bridges</description>
    <completiondate>09/24/2021</completiondate>
    <lettingdate>04/17/2019</lettingdate>
    <contractor>Nichols Long &amp; Moore Construction Corporation</contractor>
    <contractno>TAB 19-23B/D214731</contractno>
    <contractno>TAB 19-23B/D214731</contractno>
    <division>Buffalo</division>
    <id>B729.2</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-78.909231</longitude>
    <latitude>42.952635</latitude>
    <locationdescription>VULCAN ST. (EXIT) BRIDGE</locationdescription>
    <numlocations>19</numlocations>
    <constructionamount>$5,901,071.14</constructionamount>
    <description>Eastern Buffalo Division Joint Replacement on 19 Bridges</description>
    <completiondate>09/24/2021</completiondate>
    <lettingdate>04/17/2019</lettingdate>
    <contractor>Nichols Long &amp; Moore Construction Corporation</contractor>
    <contractno>TAB 19-23B/D214731</contractno>
    <contractno>TAB 19-23B/D214731</contractno>
    <division>Buffalo</division>
    <id>B729.2</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-78.871441</longitude>
    <latitude>42.877458</latitude>
    <locationdescription>RAMP "U" NB TWY TO ELM ST. BRIDGE</locationdescription>
    <numlocations>19</numlocations>
    <constructionamount>$5,901,071.14</constructionamount>
    <description>Eastern Buffalo Division Joint Replacement on 19 Bridges</description>
    <completiondate>09/24/2021</completiondate>
    <lettingdate>04/17/2019</lettingdate>
    <contractor>Nichols Long &amp; Moore Construction Corporation</contractor>
    <contractno>TAB 19-23B/D214731</contractno>
    <contractno>TAB 19-23B/D214731</contractno>
    <division>Buffalo</division>
    <id>B729.2</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-78.873127</longitude>
    <latitude>42.87788</latitude>
    <locationdescription>RAMP "W"SB OAK ST TO SB TWY BRIDGE</locationdescription>
    <numlocations>19</numlocations>
    <constructionamount>$5,901,071.14</constructionamount>
    <description>Eastern Buffalo Division Joint Replacement on 19 Bridges</description>
    <completiondate>09/24/2021</completiondate>
    <lettingdate>04/17/2019</lettingdate>
    <contractor>Nichols Long &amp; Moore Construction Corporation</contractor>
    <contractno>TAB 19-23B/D214731</contractno>
    <contractno>TAB 19-23B/D214731</contractno>
    <division>Buffalo</division>
    <id>B729.2</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-78.632513</longitude>
    <latitude>42.94847</latitude>
    <locationdescription>GUNVILLE ROAD BRIDGE</locationdescription>
    <numlocations>19</numlocations>
    <constructionamount>$5,901,071.14</constructionamount>
    <description>Eastern Buffalo Division Joint Replacement on 19 Bridges</description>
    <completiondate>09/24/2021</completiondate>
    <lettingdate>04/17/2019</lettingdate>
    <contractor>Nichols Long &amp; Moore Construction Corporation</contractor>
    <contractno>TAB 19-23B/D214731</contractno>
    <contractno>TAB 19-23B/D214731</contractno>
    <division>Buffalo</division>
    <id>B729.2</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-77.964644</longitude>
    <latitude>43.028921</latitude>
    <locationdescription>LEROY INTERCHANGE BRIDGE</locationdescription>
    <numlocations>19</numlocations>
    <constructionamount>$5,901,071.14</constructionamount>
    <description>Eastern Buffalo Division Joint Replacement on 19 Bridges</description>
    <completiondate>09/24/2021</completiondate>
    <lettingdate>04/17/2019</lettingdate>
    <contractor>Nichols Long &amp; Moore Construction Corporation</contractor>
    <contractno>TAB 19-23B/D214731</contractno>
    <contractno>TAB 19-23B/D214731</contractno>
    <division>Buffalo</division>
    <id>B729.2</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-78.872618</longitude>
    <latitude>42.876747</latitude>
    <locationdescription>RAMP "V" SB TWY TO ELM ST. BRIDGE</locationdescription>
    <numlocations>19</numlocations>
    <constructionamount>$5,901,071.14</constructionamount>
    <description>Eastern Buffalo Division Joint Replacement on 19 Bridges</description>
    <completiondate>09/24/2021</completiondate>
    <lettingdate>04/17/2019</lettingdate>
    <contractor>Nichols Long &amp; Moore Construction Corporation</contractor>
    <contractno>TAB 19-23B/D214731</contractno>
    <contractno>TAB 19-23B/D214731</contractno>
    <division>Buffalo</division>
    <id>B729.2</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.773216</longitude>
    <latitude>42.509336</latitude>
    <locationdescription>CASTLETON-ON-HUDSON BRIDGE</locationdescription>
    <numlocations>1</numlocations>
    <constructionamount>$47,597,817.46</constructionamount>
    <description>MP 801.08: Castleton Bridge - Rehabilitation</description>
    <completiondate>08/23/2023</completiondate>
    <lettingdate>03/24/2021</lettingdate>
    <contractor>Lancaster Development &amp; Tully Construction Co. LLC dba L&amp;T Construction</contractor>
    <contractno>TABS 21-1B/D214800</contractno>
    <contractno>TABS 21-1B/D214800</contractno>
    <division>Albany</division>
    <id>B735.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-76.730763</longitude>
    <latitude>42.997986</latitude>
    <locationdescription>SENECA RIVER (WB) BRIDGE</locationdescription>
    <numlocations>2</numlocations>
    <constructionamount>$2,677,177.70</constructionamount>
    <description>MP 313.82  and MP 320.41: Rehabilitation of Seneca RIver Bridge WB and Clyde Waterloo Interchange (MP 320.41)</description>
    <completiondate>12/31/2024</completiondate>
    <lettingdate>03/20/2024</lettingdate>
    <contractor>Slate Hill Constructors Inc</contractor>
    <contractno>TAS 24-16B/D214970</contractno>
    <contractno>TAS 24-16B/D214970</contractno>
    <division>Syracuse</division>
    <id>B754.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-76.85232</longitude>
    <latitude>42.967516</latitude>
    <locationdescription>CLYDE WATERLOO INTERCHANGE BRIDGE</locationdescription>
    <numlocations>2</numlocations>
    <constructionamount>$2,677,177.70</constructionamount>
    <description>MP 313.82  and MP 320.41: Rehabilitation of Seneca RIver Bridge WB and Clyde Waterloo Interchange (MP 320.41)</description>
    <completiondate>12/31/2024</completiondate>
    <lettingdate>03/20/2024</lettingdate>
    <contractor>Slate Hill Constructors Inc</contractor>
    <contractno>TAS 24-16B/D214970</contractno>
    <contractno>TAS 24-16B/D214970</contractno>
    <division>Syracuse</division>
    <id>B754.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.826385</longitude>
    <latitude>40.856202</latitude>
    <locationdescription>NE - MP: 600.17 to 614.11</locationdescription>
    <numlocations>1</numlocations>
    <constructionamount>$490,700.00</constructionamount>
    <description>I-95 (New England Thruway) Bridge Maintenance Cleaning for Steel Preservation - 2021</description>
    <completiondate>07/08/2021</completiondate>
    <lettingdate>02/10/2021</lettingdate>
    <contractor>Deangelo Bros., LLC.</contractor>
    <contractno>TANE 21-10B/D214819</contractno>
    <contractno>TANE 21-10B/D214819</contractno>
    <division>New York</division>
    <id>B763.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-78.936907</longitude>
    <latitude>42.998376</latitude>
    <locationdescription>S. GRAND IS. SB (OLD) BRIDGE</locationdescription>
    <numlocations>4</numlocations>
    <constructionamount>$632,222.00</constructionamount>
    <description>South and North Grand Island Bridges: Maintenance Cleaning for Steel Preservation - 2022</description>
    <completiondate>07/27/2022</completiondate>
    <lettingdate>02/09/2022</lettingdate>
    <contractor />
    <contractno>TAN 22-10B/D214862</contractno>
    <contractno>TAN 22-10B/D214862</contractno>
    <division>Buffalo</division>
    <id>B772.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-78.936632</longitude>
    <latitude>42.998643</latitude>
    <locationdescription>S. GRAND IS. NB (NEW) BRIDGE</locationdescription>
    <numlocations>4</numlocations>
    <constructionamount>$632,222.00</constructionamount>
    <description>South and North Grand Island Bridges: Maintenance Cleaning for Steel Preservation - 2022</description>
    <completiondate>07/27/2022</completiondate>
    <lettingdate>02/09/2022</lettingdate>
    <contractor />
    <contractno>TAN 22-10B/D214862</contractno>
    <contractno>TAN 22-10B/D214862</contractno>
    <division>Buffalo</division>
    <id>B772.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-78.990628</longitude>
    <latitude>43.068743</latitude>
    <locationdescription>NORTH GRAND ISLAND NB (OLD) BRIDGE</locationdescription>
    <numlocations>4</numlocations>
    <constructionamount>$632,222.00</constructionamount>
    <description>South and North Grand Island Bridges: Maintenance Cleaning for Steel Preservation - 2022</description>
    <completiondate>07/27/2022</completiondate>
    <lettingdate>02/09/2022</lettingdate>
    <contractor />
    <contractno>TAN 22-10B/D214862</contractno>
    <contractno>TAN 22-10B/D214862</contractno>
    <division>Buffalo</division>
    <id>B772.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-78.990942</longitude>
    <latitude>43.06869</latitude>
    <locationdescription>NORTH GRAND ISLAND SB (NEW) BRIDGE</locationdescription>
    <numlocations>4</numlocations>
    <constructionamount>$632,222.00</constructionamount>
    <description>South and North Grand Island Bridges: Maintenance Cleaning for Steel Preservation - 2022</description>
    <completiondate>07/27/2022</completiondate>
    <lettingdate>02/09/2022</lettingdate>
    <contractor />
    <contractno>TAN 22-10B/D214862</contractno>
    <contractno>TAN 22-10B/D214862</contractno>
    <division>Buffalo</division>
    <id>B772.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.778954</longitude>
    <latitude>42.625675</latitude>
    <locationdescription>NORMANSKILL D&amp;H RR BRIDGE</locationdescription>
    <numlocations>3</numlocations>
    <constructionamount>$11,603,750.00</constructionamount>
    <description>Albany Division: Bridge Preservation for Various Bridges - 2023</description>
    <completiondate>05/30/2025</completiondate>
    <lettingdate>04/05/2023</lettingdate>
    <contractor>DA Collins Construction</contractor>
    <contractno>TAA 23-13B/D214916</contractno>
    <contractno>TAA 23-13B/D214916</contractno>
    <division>Albany</division>
    <id>B773.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.892829</longitude>
    <latitude>42.243431</latitude>
    <locationdescription>CATSKILL CREEK BRIDGE</locationdescription>
    <numlocations>3</numlocations>
    <constructionamount>$11,603,750.00</constructionamount>
    <description>Albany Division: Bridge Preservation for Various Bridges - 2023</description>
    <completiondate>05/30/2025</completiondate>
    <lettingdate>04/05/2023</lettingdate>
    <contractor>DA Collins Construction</contractor>
    <contractno>TAA 23-13B/D214916</contractno>
    <contractno>TAA 23-13B/D214916</contractno>
    <division>Albany</division>
    <id>B773.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.914588</longitude>
    <latitude>42.217882</latitude>
    <locationdescription>KAATERSKILL CR &amp; CO RD 30 BRIDGE</locationdescription>
    <numlocations>3</numlocations>
    <constructionamount>$11,603,750.00</constructionamount>
    <description>Albany Division: Bridge Preservation for Various Bridges - 2023</description>
    <completiondate>05/30/2025</completiondate>
    <lettingdate>04/05/2023</lettingdate>
    <contractor>DA Collins Construction</contractor>
    <contractno>TAA 23-13B/D214916</contractno>
    <contractno>TAA 23-13B/D214916</contractno>
    <division>Albany</division>
    <id>B773.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-77.472454</longitude>
    <latitude>43.01446</latitude>
    <locationdescription>ML - MP: 352.71</locationdescription>
    <numlocations>1</numlocations>
    <constructionamount>$4,050,000.00</constructionamount>
    <description>Buffalo Division: Bridge Preservation for Various Bridges - 2023</description>
    <completiondate>09/23/2025</completiondate>
    <lettingdate>08/30/2023</lettingdate>
    <contractor />
    <contractno>TAB 23-12B/D214915</contractno>
    <contractno>TAB 23-12B/D214915</contractno>
    <division>Buffalo</division>
    <id>B773.2</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.826385</longitude>
    <latitude>40.856202</latitude>
    <locationdescription>NE - MP: 600.17 to 614.11</locationdescription>
    <numlocations>1</numlocations>
    <constructionamount>$497,498.00</constructionamount>
    <description>I-95 (New England Thruway) Bridge Maintenance Cleaning for Steel Preservation - 2022</description>
    <completiondate>07/11/2022</completiondate>
    <lettingdate>01/19/2022</lettingdate>
    <contractor>Fleetwash, Inc.</contractor>
    <contractno>TANE 22-9B/D214861</contractno>
    <contractno>TANE 22-9B/D214861</contractno>
    <division>New York</division>
    <id>B780.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-76.116808</longitude>
    <latitude>43.092819</latitude>
    <locationdescription>TOWN LINE ROAD BRIDGE</locationdescription>
    <numlocations>1</numlocations>
    <constructionamount>$7,569,012.20</constructionamount>
    <description>MP 280.31: Town Line Road over Thruway - Replacement</description>
    <completiondate>01/07/2026</completiondate>
    <lettingdate>08/21/2024</lettingdate>
    <contractor>Tioga Construction Company</contractor>
    <contractno>TAS 24-27B/D214986</contractno>
    <contractno>TAS 24-27B/D214986</contractno>
    <division>Syracuse</division>
    <id>B802.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-79.236923</longitude>
    <latitude>42.496771</latitude>
    <locationdescription>CENTER ROAD (CR 91) BRIDGE</locationdescription>
    <numlocations>2</numlocations>
    <constructionamount>$1,634,947.51</constructionamount>
    <description>MP 421.57 and MP 463.45: Kensington Expry-Rt.33 and Center Road (CR91) - Steel Repairs</description>
    <completiondate>09/23/2021</completiondate>
    <lettingdate>07/29/2020</lettingdate>
    <contractor>Union Concrete and Construction Corporation</contractor>
    <contractno>TAB 20-12B/D214752</contractno>
    <contractno>TAB 20-12B/D214752</contractno>
    <division>Buffalo</division>
    <id>B963.7</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-78.76631</longitude>
    <latitude>42.93254</latitude>
    <locationdescription>KENSINGTON EXPRY.-RT. 33 BRIDGE</locationdescription>
    <numlocations>2</numlocations>
    <constructionamount>$1,634,947.51</constructionamount>
    <description>MP 421.57 and MP 463.45: Kensington Expry-Rt.33 and Center Road (CR91) - Steel Repairs</description>
    <completiondate>09/23/2021</completiondate>
    <lettingdate>07/29/2020</lettingdate>
    <contractor>Union Concrete and Construction Corporation</contractor>
    <contractno>TAB 20-12B/D214752</contractno>
    <contractno>TAB 20-12B/D214752</contractno>
    <division>Buffalo</division>
    <id>B963.7</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-76.701062</longitude>
    <latitude>43.007631</latitude>
    <locationdescription>AUBURN ST. RT 90 BRIDGE</locationdescription>
    <numlocations>4</numlocations>
    <constructionamount>$1,253,857.22</constructionamount>
    <description>Syracuse Division: On-Demand Repair Contract - 2020-2021</description>
    <completiondate>01/06/2022</completiondate>
    <lettingdate>01/23/2019</lettingdate>
    <contractor>Slate Hill Constructors, Inc.</contractor>
    <contractno>TAS 19-14B/D214675</contractno>
    <contractno>TAS 19-14B/D214675</contractno>
    <division>Syracuse</division>
    <id>B993.3</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-76.770028</longitude>
    <latitude>42.986054</latitude>
    <locationdescription>HALSEY CORN. SAVANNAH RT 89 BRIDGE</locationdescription>
    <numlocations>4</numlocations>
    <constructionamount>$1,253,857.22</constructionamount>
    <description>Syracuse Division: On-Demand Repair Contract - 2020-2021</description>
    <completiondate>01/06/2022</completiondate>
    <lettingdate>01/23/2019</lettingdate>
    <contractor>Slate Hill Constructors, Inc.</contractor>
    <contractno>TAS 19-14B/D214675</contractno>
    <contractno>TAS 19-14B/D214675</contractno>
    <division>Syracuse</division>
    <id>B993.3</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-76.078809</longitude>
    <latitude>43.093773</latitude>
    <locationdescription>KINNE RD RT 298 BRIDGE</locationdescription>
    <numlocations>4</numlocations>
    <constructionamount>$1,253,857.22</constructionamount>
    <description>Syracuse Division: On-Demand Repair Contract - 2020-2021</description>
    <completiondate>01/06/2022</completiondate>
    <lettingdate>01/23/2019</lettingdate>
    <contractor>Slate Hill Constructors, Inc.</contractor>
    <contractno>TAS 19-14B/D214675</contractno>
    <contractno>TAS 19-14B/D214675</contractno>
    <division>Syracuse</division>
    <id>B993.3</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-75.951818</longitude>
    <latitude>43.092118</latitude>
    <locationdescription>PINE PLAIN-KIRKVILLE RD. BRIDGE</locationdescription>
    <numlocations>4</numlocations>
    <constructionamount>$1,253,857.22</constructionamount>
    <description>Syracuse Division: On-Demand Repair Contract - 2020-2021</description>
    <completiondate>01/06/2022</completiondate>
    <lettingdate>01/23/2019</lettingdate>
    <contractor>Slate Hill Constructors, Inc.</contractor>
    <contractno>TAS 19-14B/D214675</contractno>
    <contractno>TAS 19-14B/D214675</contractno>
    <division>Syracuse</division>
    <id>B993.3</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-74.042069</longitude>
    <latitude>41.097169</latitude>
    <locationdescription>SCOTLAND HILL ROAD BRIDGE</locationdescription>
    <numlocations>1</numlocations>
    <constructionamount>$30,943,098.06</constructionamount>
    <description>Scotland Hill Road Bridge over NYS Thruway - Replacement | Related: Hungry Hollow Road Bridge over Thruway: Replacement</description>
    <completiondate>05/26/2022</completiondate>
    <lettingdate>01/22/2020</lettingdate>
    <contractor>A Servidone/B Anthony Construction Corporation</contractor>
    <contractno>TANY 19-27B/D214736</contractno>
    <contractno>TANY 19-27B/D214736</contractno>
    <division>New York</division>
    <id>B2192.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.894573</longitude>
    <latitude>41.070106</latitude>
    <locationdescription>TAPPAN ZEE BRIDGE</locationdescription>
    <numlocations>1</numlocations>
    <constructionamount>$1,367,772.50</constructionamount>
    <description>Methyl-Methacrylate Surface Treatment of NNYB SUP &amp; Adjacent Concrete Barriers</description>
    <completiondate>07/17/2020</completiondate>
    <lettingdate>03/25/2020</lettingdate>
    <contractor>Venture Construction, Inc.</contractor>
    <contractno>TANY 20-8B/D214783</contractno>
    <contractno>TANY 20-8B/D214783</contractno>
    <division>New York</division>
    <id>BO545.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.862649</longitude>
    <latitude>41.06316</latitude>
    <locationdescription>ML - MP: 12.85</locationdescription>
    <numlocations>1</numlocations>
    <constructionamount>$13,927,229.47</constructionamount>
    <description>MP 12.85: Improvements to I-87 Interchange 9 Ramp Intersection with Route 9 and Construct Route 9/I-87 Pedestrian Bridge</description>
    <completiondate>11/22/2024</completiondate>
    <lettingdate>09/14/2022</lettingdate>
    <contractor>Gianfia Corp</contractor>
    <contractno>TANY 22-24/D214865</contractno>
    <contractno>TANY 22-24/D214865</contractno>
    <division>New York</division>
    <id>H9.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.672963</longitude>
    <latitude>40.987516</latitude>
    <locationdescription>NE - MP: 614.1 to 615</locationdescription>
    <numlocations>1</numlocations>
    <constructionamount>$144,009,454.25</constructionamount>
    <description>I-95 (New England Thruway), Port Chester (MP NE14.1) to Connecticut State Line (MP NE15.0): Pavement Replacement</description>
    <completiondate>06/15/2022</completiondate>
    <lettingdate>04/11/2018</lettingdate>
    <contractor>Ecco III Enterprises, Inc</contractor>
    <contractno>TANE 18-7/D214568</contractno>
    <contractno>TANE 18-7/D214568</contractno>
    <division>New York</division>
    <id>H14.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-76.772949</longitude>
    <latitude>42.985201</latitude>
    <locationdescription>ML - MP: 316.06</locationdescription>
    <numlocations>31</numlocations>
    <constructionamount>$3,446,350.00</constructionamount>
    <description>Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019</description>
    <completiondate>11/22/2021</completiondate>
    <lettingdate>03/06/2019</lettingdate>
    <contractor>CCI Companies, Inc.</contractor>
    <contractno>TAS 19-4/D214705</contractno>
    <contractno>TAS 19-4/D214705</contractno>
    <division>Syracuse</division>
    <id>H15.3</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-75.335096</longitude>
    <latitude>43.127291</latitude>
    <locationdescription>ML - MP: 239.97</locationdescription>
    <numlocations>31</numlocations>
    <constructionamount>$3,446,350.00</constructionamount>
    <description>Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019</description>
    <completiondate>11/22/2021</completiondate>
    <lettingdate>03/06/2019</lettingdate>
    <contractor>CCI Companies, Inc.</contractor>
    <contractno>TAS 19-4/D214705</contractno>
    <contractno>TAS 19-4/D214705</contractno>
    <division>Syracuse</division>
    <id>H15.3</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-75.044901</longitude>
    <latitude>43.032384</latitude>
    <locationdescription>ML - MP: 222.77</locationdescription>
    <numlocations>31</numlocations>
    <constructionamount>$3,446,350.00</constructionamount>
    <description>Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019</description>
    <completiondate>11/22/2021</completiondate>
    <lettingdate>03/06/2019</lettingdate>
    <contractor>CCI Companies, Inc.</contractor>
    <contractno>TAS 19-4/D214705</contractno>
    <contractno>TAS 19-4/D214705</contractno>
    <division>Syracuse</division>
    <id>H15.3</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-75.301969</longitude>
    <latitude>43.129492</latitude>
    <locationdescription>ML - MP: 238.3</locationdescription>
    <numlocations>31</numlocations>
    <constructionamount>$3,446,350.00</constructionamount>
    <description>Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019</description>
    <completiondate>11/22/2021</completiondate>
    <lettingdate>03/06/2019</lettingdate>
    <contractor>CCI Companies, Inc.</contractor>
    <contractno>TAS 19-4/D214705</contractno>
    <contractno>TAS 19-4/D214705</contractno>
    <division>Syracuse</division>
    <id>H15.3</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-75.301969</longitude>
    <latitude>43.129492</latitude>
    <locationdescription>ML - MP: 238.29</locationdescription>
    <numlocations>31</numlocations>
    <constructionamount>$3,446,350.00</constructionamount>
    <description>Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019</description>
    <completiondate>11/22/2021</completiondate>
    <lettingdate>03/06/2019</lettingdate>
    <contractor>CCI Companies, Inc.</contractor>
    <contractno>TAS 19-4/D214705</contractno>
    <contractno>TAS 19-4/D214705</contractno>
    <division>Syracuse</division>
    <id>H15.3</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-74.817052</longitude>
    <latitude>43.016591</latitude>
    <locationdescription>ML - MP: 210.62</locationdescription>
    <numlocations>31</numlocations>
    <constructionamount>$3,446,350.00</constructionamount>
    <description>Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019</description>
    <completiondate>11/22/2021</completiondate>
    <lettingdate>03/06/2019</lettingdate>
    <contractor>CCI Companies, Inc.</contractor>
    <contractno>TAS 19-4/D214705</contractno>
    <contractno>TAS 19-4/D214705</contractno>
    <division>Syracuse</division>
    <id>H15.3</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-75.047379</longitude>
    <latitude>43.034635</latitude>
    <locationdescription>ML - MP: 222.99</locationdescription>
    <numlocations>31</numlocations>
    <constructionamount>$3,446,350.00</constructionamount>
    <description>Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019</description>
    <completiondate>11/22/2021</completiondate>
    <lettingdate>03/06/2019</lettingdate>
    <contractor>CCI Companies, Inc.</contractor>
    <contractno>TAS 19-4/D214705</contractno>
    <contractno>TAS 19-4/D214705</contractno>
    <division>Syracuse</division>
    <id>H15.3</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-76.043924</longitude>
    <latitude>43.094743</latitude>
    <locationdescription>ML - MP: 276.58</locationdescription>
    <numlocations>31</numlocations>
    <constructionamount>$3,446,350.00</constructionamount>
    <description>Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019</description>
    <completiondate>11/22/2021</completiondate>
    <lettingdate>03/06/2019</lettingdate>
    <contractor>CCI Companies, Inc.</contractor>
    <contractno>TAS 19-4/D214705</contractno>
    <contractno>TAS 19-4/D214705</contractno>
    <division>Syracuse</division>
    <id>H15.3</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-76.106926</longitude>
    <latitude>43.092094</latitude>
    <locationdescription>ML - MP: 279.79</locationdescription>
    <numlocations>31</numlocations>
    <constructionamount>$3,446,350.00</constructionamount>
    <description>Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019</description>
    <completiondate>11/22/2021</completiondate>
    <lettingdate>03/06/2019</lettingdate>
    <contractor>CCI Companies, Inc.</contractor>
    <contractno>TAS 19-4/D214705</contractno>
    <contractno>TAS 19-4/D214705</contractno>
    <division>Syracuse</division>
    <id>H15.3</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-75.444619</longitude>
    <latitude>43.128567</latitude>
    <locationdescription>ML - MP: 245.55</locationdescription>
    <numlocations>31</numlocations>
    <constructionamount>$3,446,350.00</constructionamount>
    <description>Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019</description>
    <completiondate>11/22/2021</completiondate>
    <lettingdate>03/06/2019</lettingdate>
    <contractor>CCI Companies, Inc.</contractor>
    <contractno>TAS 19-4/D214705</contractno>
    <contractno>TAS 19-4/D214705</contractno>
    <division>Syracuse</division>
    <id>H15.3</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-75.59972</longitude>
    <latitude>43.125297</latitude>
    <locationdescription>ML - MP: 253.56</locationdescription>
    <numlocations>31</numlocations>
    <constructionamount>$3,446,350.00</constructionamount>
    <description>Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019</description>
    <completiondate>11/22/2021</completiondate>
    <lettingdate>03/06/2019</lettingdate>
    <contractor>CCI Companies, Inc.</contractor>
    <contractno>TAS 19-4/D214705</contractno>
    <contractno>TAS 19-4/D214705</contractno>
    <division>Syracuse</division>
    <id>H15.3</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-75.296577</longitude>
    <latitude>43.131303</latitude>
    <locationdescription>ML - MP: 238.04</locationdescription>
    <numlocations>31</numlocations>
    <constructionamount>$3,446,350.00</constructionamount>
    <description>Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019</description>
    <completiondate>11/22/2021</completiondate>
    <lettingdate>03/06/2019</lettingdate>
    <contractor>CCI Companies, Inc.</contractor>
    <contractno>TAS 19-4/D214705</contractno>
    <contractno>TAS 19-4/D214705</contractno>
    <division>Syracuse</division>
    <id>H15.3</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-74.74121</longitude>
    <latitude>42.995246</latitude>
    <locationdescription>ML - MP: 206.44</locationdescription>
    <numlocations>31</numlocations>
    <constructionamount>$3,446,350.00</constructionamount>
    <description>Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019</description>
    <completiondate>11/22/2021</completiondate>
    <lettingdate>03/06/2019</lettingdate>
    <contractor>CCI Companies, Inc.</contractor>
    <contractno>TAS 19-4/D214705</contractno>
    <contractno>TAS 19-4/D214705</contractno>
    <division>Syracuse</division>
    <id>H15.3</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-75.021083</longitude>
    <latitude>43.022389</latitude>
    <locationdescription>ML - MP: 221.425</locationdescription>
    <numlocations>31</numlocations>
    <constructionamount>$3,446,350.00</constructionamount>
    <description>Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019</description>
    <completiondate>11/22/2021</completiondate>
    <lettingdate>03/06/2019</lettingdate>
    <contractor>CCI Companies, Inc.</contractor>
    <contractno>TAS 19-4/D214705</contractno>
    <contractno>TAS 19-4/D214705</contractno>
    <division>Syracuse</division>
    <id>H15.3</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-75.204058</longitude>
    <latitude>43.111752</latitude>
    <locationdescription>ML - MP: 232.84</locationdescription>
    <numlocations>31</numlocations>
    <constructionamount>$3,446,350.00</constructionamount>
    <description>Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019</description>
    <completiondate>11/22/2021</completiondate>
    <lettingdate>03/06/2019</lettingdate>
    <contractor>CCI Companies, Inc.</contractor>
    <contractno>TAS 19-4/D214705</contractno>
    <contractno>TAS 19-4/D214705</contractno>
    <division>Syracuse</division>
    <id>H15.3</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-76.672567</longitude>
    <latitude>43.02385</latitude>
    <locationdescription>ML - MP: 310.3</locationdescription>
    <numlocations>31</numlocations>
    <constructionamount>$3,446,350.00</constructionamount>
    <description>Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019</description>
    <completiondate>11/22/2021</completiondate>
    <lettingdate>03/06/2019</lettingdate>
    <contractor>CCI Companies, Inc.</contractor>
    <contractno>TAS 19-4/D214705</contractno>
    <contractno>TAS 19-4/D214705</contractno>
    <division>Syracuse</division>
    <id>H15.3</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-75.021083</longitude>
    <latitude>43.022389</latitude>
    <locationdescription>ML - MP: 221.375</locationdescription>
    <numlocations>31</numlocations>
    <constructionamount>$3,446,350.00</constructionamount>
    <description>Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019</description>
    <completiondate>11/22/2021</completiondate>
    <lettingdate>03/06/2019</lettingdate>
    <contractor>CCI Companies, Inc.</contractor>
    <contractno>TAS 19-4/D214705</contractno>
    <contractno>TAS 19-4/D214705</contractno>
    <division>Syracuse</division>
    <id>H15.3</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-74.840679</longitude>
    <latitude>43.010131</latitude>
    <locationdescription>ML - MP: 211.93</locationdescription>
    <numlocations>31</numlocations>
    <constructionamount>$3,446,350.00</constructionamount>
    <description>Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019</description>
    <completiondate>11/22/2021</completiondate>
    <lettingdate>03/06/2019</lettingdate>
    <contractor>CCI Companies, Inc.</contractor>
    <contractno>TAS 19-4/D214705</contractno>
    <contractno>TAS 19-4/D214705</contractno>
    <division>Syracuse</division>
    <id>H15.3</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-74.84264</longitude>
    <latitude>43.010267</latitude>
    <locationdescription>ML - MP: 212</locationdescription>
    <numlocations>31</numlocations>
    <constructionamount>$3,446,350.00</constructionamount>
    <description>Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019</description>
    <completiondate>11/22/2021</completiondate>
    <lettingdate>03/06/2019</lettingdate>
    <contractor>CCI Companies, Inc.</contractor>
    <contractno>TAS 19-4/D214705</contractno>
    <contractno>TAS 19-4/D214705</contractno>
    <division>Syracuse</division>
    <id>H15.3</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-75.296577</longitude>
    <latitude>43.131303</latitude>
    <locationdescription>ML - MP: 238.02</locationdescription>
    <numlocations>31</numlocations>
    <constructionamount>$3,446,350.00</constructionamount>
    <description>Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019</description>
    <completiondate>11/22/2021</completiondate>
    <lettingdate>03/06/2019</lettingdate>
    <contractor>CCI Companies, Inc.</contractor>
    <contractno>TAS 19-4/D214705</contractno>
    <contractno>TAS 19-4/D214705</contractno>
    <division>Syracuse</division>
    <id>H15.3</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-75.300174</longitude>
    <latitude>43.130099</latitude>
    <locationdescription>ML - MP: 238.24</locationdescription>
    <numlocations>31</numlocations>
    <constructionamount>$3,446,350.00</constructionamount>
    <description>Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019</description>
    <completiondate>11/22/2021</completiondate>
    <lettingdate>03/06/2019</lettingdate>
    <contractor>CCI Companies, Inc.</contractor>
    <contractno>TAS 19-4/D214705</contractno>
    <contractno>TAS 19-4/D214705</contractno>
    <division>Syracuse</division>
    <id>H15.3</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-75.298376</longitude>
    <latitude>43.130701</latitude>
    <locationdescription>ML - MP: 238.1</locationdescription>
    <numlocations>31</numlocations>
    <constructionamount>$3,446,350.00</constructionamount>
    <description>Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019</description>
    <completiondate>11/22/2021</completiondate>
    <lettingdate>03/06/2019</lettingdate>
    <contractor>CCI Companies, Inc.</contractor>
    <contractno>TAS 19-4/D214705</contractno>
    <contractno>TAS 19-4/D214705</contractno>
    <division>Syracuse</division>
    <id>H15.3</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-75.300174</longitude>
    <latitude>43.130099</latitude>
    <locationdescription>ML - MP: 238.23</locationdescription>
    <numlocations>31</numlocations>
    <constructionamount>$3,446,350.00</constructionamount>
    <description>Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019</description>
    <completiondate>11/22/2021</completiondate>
    <lettingdate>03/06/2019</lettingdate>
    <contractor>CCI Companies, Inc.</contractor>
    <contractno>TAS 19-4/D214705</contractno>
    <contractno>TAS 19-4/D214705</contractno>
    <division>Syracuse</division>
    <id>H15.3</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-77.401257</longitude>
    <latitude>42.997451</latitude>
    <locationdescription>ML - MP: 348.76</locationdescription>
    <numlocations>31</numlocations>
    <constructionamount>$3,446,350.00</constructionamount>
    <description>Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019</description>
    <completiondate>11/22/2021</completiondate>
    <lettingdate>03/06/2019</lettingdate>
    <contractor>CCI Companies, Inc.</contractor>
    <contractno>TAS 19-4/D214705</contractno>
    <contractno>TAS 19-4/D214705</contractno>
    <division>Syracuse</division>
    <id>H15.3</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-74.730838</longitude>
    <latitude>42.991084</latitude>
    <locationdescription>ML - MP: 205.83</locationdescription>
    <numlocations>31</numlocations>
    <constructionamount>$3,446,350.00</constructionamount>
    <description>Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019</description>
    <completiondate>11/22/2021</completiondate>
    <lettingdate>03/06/2019</lettingdate>
    <contractor>CCI Companies, Inc.</contractor>
    <contractno>TAS 19-4/D214705</contractno>
    <contractno>TAS 19-4/D214705</contractno>
    <division>Syracuse</division>
    <id>H15.3</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-74.751501</longitude>
    <latitude>42.999526</latitude>
    <locationdescription>ML - MP: 207.03</locationdescription>
    <numlocations>31</numlocations>
    <constructionamount>$3,446,350.00</constructionamount>
    <description>Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019</description>
    <completiondate>11/22/2021</completiondate>
    <lettingdate>03/06/2019</lettingdate>
    <contractor>CCI Companies, Inc.</contractor>
    <contractno>TAS 19-4/D214705</contractno>
    <contractno>TAS 19-4/D214705</contractno>
    <division>Syracuse</division>
    <id>H15.3</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-76.079468</longitude>
    <latitude>43.093739</latitude>
    <locationdescription>ML - MP: 278.41</locationdescription>
    <numlocations>31</numlocations>
    <constructionamount>$3,446,350.00</constructionamount>
    <description>Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019</description>
    <completiondate>11/22/2021</completiondate>
    <lettingdate>03/06/2019</lettingdate>
    <contractor>CCI Companies, Inc.</contractor>
    <contractno>TAS 19-4/D214705</contractno>
    <contractno>TAS 19-4/D214705</contractno>
    <division>Syracuse</division>
    <id>H15.3</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-75.762539</longitude>
    <latitude>43.090071</latitude>
    <locationdescription>ML - MP: 262.28</locationdescription>
    <numlocations>31</numlocations>
    <constructionamount>$3,446,350.00</constructionamount>
    <description>Syracuse Division: Various Culvert Rehabilitations/Replacements - 2019</description>
    <completiondate>11/22/2021</completiondate>
    <lettingdate>03/06/2019</lettingdate>
    <contractor>CCI Companies, Inc.</contractor>
    <contractno>TAS 19-4/D214705</contractno>
    <contractno>TAS 19-4/D214705</contractno>
    <division>Syracuse</division>
    <id>H15.3</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.848128</longitude>
    <latitude>42.362334</latitude>
    <locationdescription>ML - MP: 122.02</locationdescription>
    <numlocations>51</numlocations>
    <constructionamount>$4,795,115.00</constructionamount>
    <description>Albany Division: Various Culvert Rehabilitations/Replacements - 2021</description>
    <completiondate>11/18/2022</completiondate>
    <lettingdate>07/14/2021</lettingdate>
    <contractor>Rifenburg Construction, Inc.</contractor>
    <contractno>TAA 21-11/D214777</contractno>
    <contractno>TAA 21-11/D214777</contractno>
    <division>Albany</division>
    <id>H15.4</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.784599</longitude>
    <latitude>42.601717</latitude>
    <locationdescription>ML - MP: 139.73</locationdescription>
    <numlocations>51</numlocations>
    <constructionamount>$4,795,115.00</constructionamount>
    <description>Albany Division: Various Culvert Rehabilitations/Replacements - 2021</description>
    <completiondate>11/18/2022</completiondate>
    <lettingdate>07/14/2021</lettingdate>
    <contractor>Rifenburg Construction, Inc.</contractor>
    <contractno>TAA 21-11/D214777</contractno>
    <contractno>TAA 21-11/D214777</contractno>
    <division>Albany</division>
    <id>H15.4</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-74.517873</longitude>
    <latitude>42.893367</latitude>
    <locationdescription>ML - MP: 191.55</locationdescription>
    <numlocations>51</numlocations>
    <constructionamount>$4,795,115.00</constructionamount>
    <description>Albany Division: Various Culvert Rehabilitations/Replacements - 2021</description>
    <completiondate>11/18/2022</completiondate>
    <lettingdate>07/14/2021</lettingdate>
    <contractor>Rifenburg Construction, Inc.</contractor>
    <contractno>TAA 21-11/D214777</contractno>
    <contractno>TAA 21-11/D214777</contractno>
    <division>Albany</division>
    <id>H15.4</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-74.173977</longitude>
    <latitude>42.918101</latitude>
    <locationdescription>ML - MP: 172.38</locationdescription>
    <numlocations>51</numlocations>
    <constructionamount>$4,795,115.00</constructionamount>
    <description>Albany Division: Various Culvert Rehabilitations/Replacements - 2021</description>
    <completiondate>11/18/2022</completiondate>
    <lettingdate>07/14/2021</lettingdate>
    <contractor>Rifenburg Construction, Inc.</contractor>
    <contractno>TAA 21-11/D214777</contractno>
    <contractno>TAA 21-11/D214777</contractno>
    <division>Albany</division>
    <id>H15.4</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.808492</longitude>
    <latitude>42.48272</latitude>
    <locationdescription>ML - MP: 131.11</locationdescription>
    <numlocations>51</numlocations>
    <constructionamount>$4,795,115.00</constructionamount>
    <description>Albany Division: Various Culvert Rehabilitations/Replacements - 2021</description>
    <completiondate>11/18/2022</completiondate>
    <lettingdate>07/14/2021</lettingdate>
    <contractor>Rifenburg Construction, Inc.</contractor>
    <contractno>TAA 21-11/D214777</contractno>
    <contractno>TAA 21-11/D214777</contractno>
    <division>Albany</division>
    <id>H15.4</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.713546</longitude>
    <latitude>42.493078</latitude>
    <locationdescription>B - MP: 804.23</locationdescription>
    <numlocations>51</numlocations>
    <constructionamount>$4,795,115.00</constructionamount>
    <description>Albany Division: Various Culvert Rehabilitations/Replacements - 2021</description>
    <completiondate>11/18/2022</completiondate>
    <lettingdate>07/14/2021</lettingdate>
    <contractor>Rifenburg Construction, Inc.</contractor>
    <contractno>TAA 21-11/D214777</contractno>
    <contractno>TAA 21-11/D214777</contractno>
    <division>Albany</division>
    <id>H15.4</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.426634</longitude>
    <latitude>42.357376</latitude>
    <locationdescription>B - MP: 823.27</locationdescription>
    <numlocations>51</numlocations>
    <constructionamount>$4,795,115.00</constructionamount>
    <description>Albany Division: Various Culvert Rehabilitations/Replacements - 2021</description>
    <completiondate>11/18/2022</completiondate>
    <lettingdate>07/14/2021</lettingdate>
    <contractor>Rifenburg Construction, Inc.</contractor>
    <contractno>TAA 21-11/D214777</contractno>
    <contractno>TAA 21-11/D214777</contractno>
    <division>Albany</division>
    <id>H15.4</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.808341</longitude>
    <latitude>42.484163</latitude>
    <locationdescription>ML - MP: 131.24</locationdescription>
    <numlocations>51</numlocations>
    <constructionamount>$4,795,115.00</constructionamount>
    <description>Albany Division: Various Culvert Rehabilitations/Replacements - 2021</description>
    <completiondate>11/18/2022</completiondate>
    <lettingdate>07/14/2021</lettingdate>
    <contractor>Rifenburg Construction, Inc.</contractor>
    <contractno>TAA 21-11/D214777</contractno>
    <contractno>TAA 21-11/D214777</contractno>
    <division>Albany</division>
    <id>H15.4</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.805745</longitude>
    <latitude>42.471321</latitude>
    <locationdescription>ML - MP: 130.28</locationdescription>
    <numlocations>51</numlocations>
    <constructionamount>$4,795,115.00</constructionamount>
    <description>Albany Division: Various Culvert Rehabilitations/Replacements - 2021</description>
    <completiondate>11/18/2022</completiondate>
    <lettingdate>07/14/2021</lettingdate>
    <contractor>Rifenburg Construction, Inc.</contractor>
    <contractno>TAA 21-11/D214777</contractno>
    <contractno>TAA 21-11/D214777</contractno>
    <division>Albany</division>
    <id>H15.4</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.982934</longitude>
    <latitude>42.773854</latitude>
    <locationdescription>ML - MP: 156.66</locationdescription>
    <numlocations>51</numlocations>
    <constructionamount>$4,795,115.00</constructionamount>
    <description>Albany Division: Various Culvert Rehabilitations/Replacements - 2021</description>
    <completiondate>11/18/2022</completiondate>
    <lettingdate>07/14/2021</lettingdate>
    <contractor>Rifenburg Construction, Inc.</contractor>
    <contractno>TAA 21-11/D214777</contractno>
    <contractno>TAA 21-11/D214777</contractno>
    <division>Albany</division>
    <id>H15.4</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.806048</longitude>
    <latitude>42.488122</latitude>
    <locationdescription>ML - MP: 131.49</locationdescription>
    <numlocations>51</numlocations>
    <constructionamount>$4,795,115.00</constructionamount>
    <description>Albany Division: Various Culvert Rehabilitations/Replacements - 2021</description>
    <completiondate>11/18/2022</completiondate>
    <lettingdate>07/14/2021</lettingdate>
    <contractor>Rifenburg Construction, Inc.</contractor>
    <contractno>TAA 21-11/D214777</contractno>
    <contractno>TAA 21-11/D214777</contractno>
    <division>Albany</division>
    <id>H15.4</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.425136</longitude>
    <latitude>42.356447</latitude>
    <locationdescription>B - MP: 823.37</locationdescription>
    <numlocations>51</numlocations>
    <constructionamount>$4,795,115.00</constructionamount>
    <description>Albany Division: Various Culvert Rehabilitations/Replacements - 2021</description>
    <completiondate>11/18/2022</completiondate>
    <lettingdate>07/14/2021</lettingdate>
    <contractor>Rifenburg Construction, Inc.</contractor>
    <contractno>TAA 21-11/D214777</contractno>
    <contractno>TAA 21-11/D214777</contractno>
    <division>Albany</division>
    <id>H15.4</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.8039</longitude>
    <latitude>42.429633</latitude>
    <locationdescription>ML - MP: 127.34</locationdescription>
    <numlocations>51</numlocations>
    <constructionamount>$4,795,115.00</constructionamount>
    <description>Albany Division: Various Culvert Rehabilitations/Replacements - 2021</description>
    <completiondate>11/18/2022</completiondate>
    <lettingdate>07/14/2021</lettingdate>
    <contractor>Rifenburg Construction, Inc.</contractor>
    <contractno>TAA 21-11/D214777</contractno>
    <contractno>TAA 21-11/D214777</contractno>
    <division>Albany</division>
    <id>H15.4</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.919913</longitude>
    <latitude>42.199008</latitude>
    <locationdescription>ML - MP: 109.75</locationdescription>
    <numlocations>51</numlocations>
    <constructionamount>$4,795,115.00</constructionamount>
    <description>Albany Division: Various Culvert Rehabilitations/Replacements - 2021</description>
    <completiondate>11/18/2022</completiondate>
    <lettingdate>07/14/2021</lettingdate>
    <contractor>Rifenburg Construction, Inc.</contractor>
    <contractno>TAA 21-11/D214777</contractno>
    <contractno>TAA 21-11/D214777</contractno>
    <division>Albany</division>
    <id>H15.4</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.792563</longitude>
    <latitude>42.505707</latitude>
    <locationdescription>ML - MP: 132.91</locationdescription>
    <numlocations>51</numlocations>
    <constructionamount>$4,795,115.00</constructionamount>
    <description>Albany Division: Various Culvert Rehabilitations/Replacements - 2021</description>
    <completiondate>11/18/2022</completiondate>
    <lettingdate>07/14/2021</lettingdate>
    <contractor>Rifenburg Construction, Inc.</contractor>
    <contractno>TAA 21-11/D214777</contractno>
    <contractno>TAA 21-11/D214777</contractno>
    <division>Albany</division>
    <id>H15.4</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.555299</longitude>
    <latitude>42.439527</latitude>
    <locationdescription>B - MP: 813.65</locationdescription>
    <numlocations>51</numlocations>
    <constructionamount>$4,795,115.00</constructionamount>
    <description>Albany Division: Various Culvert Rehabilitations/Replacements - 2021</description>
    <completiondate>11/18/2022</completiondate>
    <lettingdate>07/14/2021</lettingdate>
    <contractor>Rifenburg Construction, Inc.</contractor>
    <contractno>TAA 21-11/D214777</contractno>
    <contractno>TAA 21-11/D214777</contractno>
    <division>Albany</division>
    <id>H15.4</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.422066</longitude>
    <latitude>42.354655</latitude>
    <locationdescription>B - MP: 823.58</locationdescription>
    <numlocations>51</numlocations>
    <constructionamount>$4,795,115.00</constructionamount>
    <description>Albany Division: Various Culvert Rehabilitations/Replacements - 2021</description>
    <completiondate>11/18/2022</completiondate>
    <lettingdate>07/14/2021</lettingdate>
    <contractor>Rifenburg Construction, Inc.</contractor>
    <contractno>TAA 21-11/D214777</contractno>
    <contractno>TAA 21-11/D214777</contractno>
    <division>Albany</division>
    <id>H15.4</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.806454</longitude>
    <latitude>42.474169</latitude>
    <locationdescription>ML - MP: 130.46</locationdescription>
    <numlocations>51</numlocations>
    <constructionamount>$4,795,115.00</constructionamount>
    <description>Albany Division: Various Culvert Rehabilitations/Replacements - 2021</description>
    <completiondate>11/18/2022</completiondate>
    <lettingdate>07/14/2021</lettingdate>
    <contractor>Rifenburg Construction, Inc.</contractor>
    <contractno>TAA 21-11/D214777</contractno>
    <contractno>TAA 21-11/D214777</contractno>
    <division>Albany</division>
    <id>H15.4</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.848128</longitude>
    <latitude>42.362334</latitude>
    <locationdescription>ML - MP: 122.03</locationdescription>
    <numlocations>51</numlocations>
    <constructionamount>$4,795,115.00</constructionamount>
    <description>Albany Division: Various Culvert Rehabilitations/Replacements - 2021</description>
    <completiondate>11/18/2022</completiondate>
    <lettingdate>07/14/2021</lettingdate>
    <contractor>Rifenburg Construction, Inc.</contractor>
    <contractno>TAA 21-11/D214777</contractno>
    <contractno>TAA 21-11/D214777</contractno>
    <division>Albany</division>
    <id>H15.4</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.807069</longitude>
    <latitude>42.486886</latitude>
    <locationdescription>ML - MP: 131.38</locationdescription>
    <numlocations>51</numlocations>
    <constructionamount>$4,795,115.00</constructionamount>
    <description>Albany Division: Various Culvert Rehabilitations/Replacements - 2021</description>
    <completiondate>11/18/2022</completiondate>
    <lettingdate>07/14/2021</lettingdate>
    <contractor>Rifenburg Construction, Inc.</contractor>
    <contractno>TAA 21-11/D214777</contractno>
    <contractno>TAA 21-11/D214777</contractno>
    <division>Albany</division>
    <id>H15.4</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.669834</longitude>
    <latitude>42.48211</latitude>
    <locationdescription>B - MP: 806.58</locationdescription>
    <numlocations>51</numlocations>
    <constructionamount>$4,795,115.00</constructionamount>
    <description>Albany Division: Various Culvert Rehabilitations/Replacements - 2021</description>
    <completiondate>11/18/2022</completiondate>
    <lettingdate>07/14/2021</lettingdate>
    <contractor>Rifenburg Construction, Inc.</contractor>
    <contractno>TAA 21-11/D214777</contractno>
    <contractno>TAA 21-11/D214777</contractno>
    <division>Albany</division>
    <id>H15.4</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.805171</longitude>
    <latitude>42.439524</latitude>
    <locationdescription>ML - MP: 128.04</locationdescription>
    <numlocations>51</numlocations>
    <constructionamount>$4,795,115.00</constructionamount>
    <description>Albany Division: Various Culvert Rehabilitations/Replacements - 2021</description>
    <completiondate>11/18/2022</completiondate>
    <lettingdate>07/14/2021</lettingdate>
    <contractor>Rifenburg Construction, Inc.</contractor>
    <contractno>TAA 21-11/D214777</contractno>
    <contractno>TAA 21-11/D214777</contractno>
    <division>Albany</division>
    <id>H15.4</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.839928</longitude>
    <latitude>42.378469</latitude>
    <locationdescription>ML - MP: 123.15</locationdescription>
    <numlocations>51</numlocations>
    <constructionamount>$4,795,115.00</constructionamount>
    <description>Albany Division: Various Culvert Rehabilitations/Replacements - 2021</description>
    <completiondate>11/18/2022</completiondate>
    <lettingdate>07/14/2021</lettingdate>
    <contractor>Rifenburg Construction, Inc.</contractor>
    <contractno>TAA 21-11/D214777</contractno>
    <contractno>TAA 21-11/D214777</contractno>
    <division>Albany</division>
    <id>H15.4</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.84324</longitude>
    <latitude>42.37174</latitude>
    <locationdescription>ML - MP: 122.74</locationdescription>
    <numlocations>51</numlocations>
    <constructionamount>$4,795,115.00</constructionamount>
    <description>Albany Division: Various Culvert Rehabilitations/Replacements - 2021</description>
    <completiondate>11/18/2022</completiondate>
    <lettingdate>07/14/2021</lettingdate>
    <contractor>Rifenburg Construction, Inc.</contractor>
    <contractno>TAA 21-11/D214777</contractno>
    <contractno>TAA 21-11/D214777</contractno>
    <division>Albany</division>
    <id>H15.4</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-74.605908</longitude>
    <latitude>42.914826</latitude>
    <locationdescription>ML - MP: 196.45</locationdescription>
    <numlocations>51</numlocations>
    <constructionamount>$4,795,115.00</constructionamount>
    <description>Albany Division: Various Culvert Rehabilitations/Replacements - 2021</description>
    <completiondate>11/18/2022</completiondate>
    <lettingdate>07/14/2021</lettingdate>
    <contractor>Rifenburg Construction, Inc.</contractor>
    <contractno>TAA 21-11/D214777</contractno>
    <contractno>TAA 21-11/D214777</contractno>
    <division>Albany</division>
    <id>H15.4</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-74.273545</longitude>
    <latitude>42.93187</latitude>
    <locationdescription>ML - MP: 177.56</locationdescription>
    <numlocations>51</numlocations>
    <constructionamount>$4,795,115.00</constructionamount>
    <description>Albany Division: Various Culvert Rehabilitations/Replacements - 2021</description>
    <completiondate>11/18/2022</completiondate>
    <lettingdate>07/14/2021</lettingdate>
    <contractor>Rifenburg Construction, Inc.</contractor>
    <contractno>TAA 21-11/D214777</contractno>
    <contractno>TAA 21-11/D214777</contractno>
    <division>Albany</division>
    <id>H15.4</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-74.104595</longitude>
    <latitude>42.898629</latitude>
    <locationdescription>ML - MP: 168.64</locationdescription>
    <numlocations>51</numlocations>
    <constructionamount>$4,795,115.00</constructionamount>
    <description>Albany Division: Various Culvert Rehabilitations/Replacements - 2021</description>
    <completiondate>11/18/2022</completiondate>
    <lettingdate>07/14/2021</lettingdate>
    <contractor>Rifenburg Construction, Inc.</contractor>
    <contractno>TAA 21-11/D214777</contractno>
    <contractno>TAA 21-11/D214777</contractno>
    <division>Albany</division>
    <id>H15.4</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.805645</longitude>
    <latitude>42.468431</latitude>
    <locationdescription>ML - MP: 130.1</locationdescription>
    <numlocations>51</numlocations>
    <constructionamount>$4,795,115.00</constructionamount>
    <description>Albany Division: Various Culvert Rehabilitations/Replacements - 2021</description>
    <completiondate>11/18/2022</completiondate>
    <lettingdate>07/14/2021</lettingdate>
    <contractor>Rifenburg Construction, Inc.</contractor>
    <contractno>TAA 21-11/D214777</contractno>
    <contractno>TAA 21-11/D214777</contractno>
    <division>Albany</division>
    <id>H15.4</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.782191</longitude>
    <latitude>42.542258</latitude>
    <locationdescription>ML - MP: 135.51</locationdescription>
    <numlocations>51</numlocations>
    <constructionamount>$4,795,115.00</constructionamount>
    <description>Albany Division: Various Culvert Rehabilitations/Replacements - 2021</description>
    <completiondate>11/18/2022</completiondate>
    <lettingdate>07/14/2021</lettingdate>
    <contractor>Rifenburg Construction, Inc.</contractor>
    <contractno>TAA 21-11/D214777</contractno>
    <contractno>TAA 21-11/D214777</contractno>
    <division>Albany</division>
    <id>H15.4</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.979268</longitude>
    <latitude>42.772809</latitude>
    <locationdescription>ML - MP: 156.45</locationdescription>
    <numlocations>51</numlocations>
    <constructionamount>$4,795,115.00</constructionamount>
    <description>Albany Division: Various Culvert Rehabilitations/Replacements - 2021</description>
    <completiondate>11/18/2022</completiondate>
    <lettingdate>07/14/2021</lettingdate>
    <contractor>Rifenburg Construction, Inc.</contractor>
    <contractno>TAA 21-11/D214777</contractno>
    <contractno>TAA 21-11/D214777</contractno>
    <division>Albany</division>
    <id>H15.4</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.830153</longitude>
    <latitude>42.385521</latitude>
    <locationdescription>ML - MP: 123.89</locationdescription>
    <numlocations>51</numlocations>
    <constructionamount>$4,795,115.00</constructionamount>
    <description>Albany Division: Various Culvert Rehabilitations/Replacements - 2021</description>
    <completiondate>11/18/2022</completiondate>
    <lettingdate>07/14/2021</lettingdate>
    <contractor>Rifenburg Construction, Inc.</contractor>
    <contractno>TAA 21-11/D214777</contractno>
    <contractno>TAA 21-11/D214777</contractno>
    <division>Albany</division>
    <id>H15.4</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.807574</longitude>
    <latitude>42.478435</latitude>
    <locationdescription>ML - MP: 130.82</locationdescription>
    <numlocations>51</numlocations>
    <constructionamount>$4,795,115.00</constructionamount>
    <description>Albany Division: Various Culvert Rehabilitations/Replacements - 2021</description>
    <completiondate>11/18/2022</completiondate>
    <lettingdate>07/14/2021</lettingdate>
    <contractor>Rifenburg Construction, Inc.</contractor>
    <contractno>TAA 21-11/D214777</contractno>
    <contractno>TAA 21-11/D214777</contractno>
    <division>Albany</division>
    <id>H15.4</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.949203</longitude>
    <latitude>42.139471</latitude>
    <locationdescription>ML - MP: 105.38</locationdescription>
    <numlocations>51</numlocations>
    <constructionamount>$4,795,115.00</constructionamount>
    <description>Albany Division: Various Culvert Rehabilitations/Replacements - 2021</description>
    <completiondate>11/18/2022</completiondate>
    <lettingdate>07/14/2021</lettingdate>
    <contractor>Rifenburg Construction, Inc.</contractor>
    <contractno>TAA 21-11/D214777</contractno>
    <contractno>TAA 21-11/D214777</contractno>
    <division>Albany</division>
    <id>H15.4</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-74.494328</longitude>
    <latitude>42.89464</latitude>
    <locationdescription>ML - MP: 190.43</locationdescription>
    <numlocations>51</numlocations>
    <constructionamount>$4,795,115.00</constructionamount>
    <description>Albany Division: Various Culvert Rehabilitations/Replacements - 2021</description>
    <completiondate>11/18/2022</completiondate>
    <lettingdate>07/14/2021</lettingdate>
    <contractor>Rifenburg Construction, Inc.</contractor>
    <contractno>TAA 21-11/D214777</contractno>
    <contractno>TAA 21-11/D214777</contractno>
    <division>Albany</division>
    <id>H15.4</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.723017</longitude>
    <latitude>42.49486</latitude>
    <locationdescription>B - MP: 803.7</locationdescription>
    <numlocations>51</numlocations>
    <constructionamount>$4,795,115.00</constructionamount>
    <description>Albany Division: Various Culvert Rehabilitations/Replacements - 2021</description>
    <completiondate>11/18/2022</completiondate>
    <lettingdate>07/14/2021</lettingdate>
    <contractor>Rifenburg Construction, Inc.</contractor>
    <contractno>TAA 21-11/D214777</contractno>
    <contractno>TAA 21-11/D214777</contractno>
    <division>Albany</division>
    <id>H15.4</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-74.304984</longitude>
    <latitude>42.930056</latitude>
    <locationdescription>ML - MP: 179.22</locationdescription>
    <numlocations>51</numlocations>
    <constructionamount>$4,795,115.00</constructionamount>
    <description>Albany Division: Various Culvert Rehabilitations/Replacements - 2021</description>
    <completiondate>11/18/2022</completiondate>
    <lettingdate>07/14/2021</lettingdate>
    <contractor>Rifenburg Construction, Inc.</contractor>
    <contractno>TAA 21-11/D214777</contractno>
    <contractno>TAA 21-11/D214777</contractno>
    <division>Albany</division>
    <id>H15.4</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.979268</longitude>
    <latitude>42.772809</latitude>
    <locationdescription>ML - MP: 156.52</locationdescription>
    <numlocations>51</numlocations>
    <constructionamount>$4,795,115.00</constructionamount>
    <description>Albany Division: Various Culvert Rehabilitations/Replacements - 2021</description>
    <completiondate>11/18/2022</completiondate>
    <lettingdate>07/14/2021</lettingdate>
    <contractor>Rifenburg Construction, Inc.</contractor>
    <contractno>TAA 21-11/D214777</contractno>
    <contractno>TAA 21-11/D214777</contractno>
    <division>Albany</division>
    <id>H15.4</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.809575</longitude>
    <latitude>42.44599</latitude>
    <locationdescription>ML - MP: 128.51</locationdescription>
    <numlocations>51</numlocations>
    <constructionamount>$4,795,115.00</constructionamount>
    <description>Albany Division: Various Culvert Rehabilitations/Replacements - 2021</description>
    <completiondate>11/18/2022</completiondate>
    <lettingdate>07/14/2021</lettingdate>
    <contractor>Rifenburg Construction, Inc.</contractor>
    <contractno>TAA 21-11/D214777</contractno>
    <contractno>TAA 21-11/D214777</contractno>
    <division>Albany</division>
    <id>H15.4</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.788923</longitude>
    <latitude>42.522792</latitude>
    <locationdescription>ML - MP: 134.05</locationdescription>
    <numlocations>51</numlocations>
    <constructionamount>$4,795,115.00</constructionamount>
    <description>Albany Division: Various Culvert Rehabilitations/Replacements - 2021</description>
    <completiondate>11/18/2022</completiondate>
    <lettingdate>07/14/2021</lettingdate>
    <contractor>Rifenburg Construction, Inc.</contractor>
    <contractno>TAA 21-11/D214777</contractno>
    <contractno>TAA 21-11/D214777</contractno>
    <division>Albany</division>
    <id>H15.4</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-74.304984</longitude>
    <latitude>42.930056</latitude>
    <locationdescription>ML - MP: 179.21</locationdescription>
    <numlocations>51</numlocations>
    <constructionamount>$4,795,115.00</constructionamount>
    <description>Albany Division: Various Culvert Rehabilitations/Replacements - 2021</description>
    <completiondate>11/18/2022</completiondate>
    <lettingdate>07/14/2021</lettingdate>
    <contractor>Rifenburg Construction, Inc.</contractor>
    <contractno>TAA 21-11/D214777</contractno>
    <contractno>TAA 21-11/D214777</contractno>
    <division>Albany</division>
    <id>H15.4</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.788923</longitude>
    <latitude>42.522792</latitude>
    <locationdescription>ML - MP: 134.07</locationdescription>
    <numlocations>51</numlocations>
    <constructionamount>$4,795,115.00</constructionamount>
    <description>Albany Division: Various Culvert Rehabilitations/Replacements - 2021</description>
    <completiondate>11/18/2022</completiondate>
    <lettingdate>07/14/2021</lettingdate>
    <contractor>Rifenburg Construction, Inc.</contractor>
    <contractno>TAA 21-11/D214777</contractno>
    <contractno>TAA 21-11/D214777</contractno>
    <division>Albany</division>
    <id>H15.4</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.977467</longitude>
    <latitude>42.772227</latitude>
    <locationdescription>ML - MP: 156.37</locationdescription>
    <numlocations>51</numlocations>
    <constructionamount>$4,795,115.00</constructionamount>
    <description>Albany Division: Various Culvert Rehabilitations/Replacements - 2021</description>
    <completiondate>11/18/2022</completiondate>
    <lettingdate>07/14/2021</lettingdate>
    <contractor>Rifenburg Construction, Inc.</contractor>
    <contractno>TAA 21-11/D214777</contractno>
    <contractno>TAA 21-11/D214777</contractno>
    <division>Albany</division>
    <id>H15.4</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.981082</longitude>
    <latitude>42.773366</latitude>
    <locationdescription>ML - MP: 156.59</locationdescription>
    <numlocations>51</numlocations>
    <constructionamount>$4,795,115.00</constructionamount>
    <description>Albany Division: Various Culvert Rehabilitations/Replacements - 2021</description>
    <completiondate>11/18/2022</completiondate>
    <lettingdate>07/14/2021</lettingdate>
    <contractor>Rifenburg Construction, Inc.</contractor>
    <contractno>TAA 21-11/D214777</contractno>
    <contractno>TAA 21-11/D214777</contractno>
    <division>Albany</division>
    <id>H15.4</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.835934</longitude>
    <latitude>42.381624</latitude>
    <locationdescription>ML - MP: 123.45</locationdescription>
    <numlocations>51</numlocations>
    <constructionamount>$4,795,115.00</constructionamount>
    <description>Albany Division: Various Culvert Rehabilitations/Replacements - 2021</description>
    <completiondate>11/18/2022</completiondate>
    <lettingdate>07/14/2021</lettingdate>
    <contractor>Rifenburg Construction, Inc.</contractor>
    <contractno>TAA 21-11/D214777</contractno>
    <contractno>TAA 21-11/D214777</contractno>
    <division>Albany</division>
    <id>H15.4</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-74.048809</longitude>
    <latitude>41.097015</latitude>
    <locationdescription>ML - MP: 24 to 29.4</locationdescription>
    <numlocations>1</numlocations>
    <constructionamount>$18,416,748.00</constructionamount>
    <description>MP 24.0 to MP 29.4: 2" Mill and Overlay: Pavement Resurfacing and Bridge Deck Repairs at MP 25.10</description>
    <completiondate>05/08/2025</completiondate>
    <lettingdate>03/13/2024</lettingdate>
    <contractor>JR Cruz Corp</contractor>
    <contractno>TANY 24-10/D214962</contractno>
    <contractno>TANY 24-10/D214962</contractno>
    <division>New York</division>
    <id>H139.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.942921</longitude>
    <latitude>42.758597</latitude>
    <locationdescription>ML - MP: 154.4 to 163.3</locationdescription>
    <numlocations>1</numlocations>
    <constructionamount>$19,078,115.00</constructionamount>
    <description>West of Schenectady / I-890 (Exit 25, MP 154.30) to west of Schenectady / Scotia  (Exit 26, MP 161.3): Pavement Resurfacing</description>
    <completiondate>06/30/2025</completiondate>
    <lettingdate>02/07/2024</lettingdate>
    <contractor>Callanan Industries  Inc.</contractor>
    <contractno>TAA 24-7/D214940</contractno>
    <contractno>TAA 24-7/D214940</contractno>
    <division>Albany</division>
    <id>H140.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-77.447179</longitude>
    <latitude>43.011786</latitude>
    <locationdescription>ML - MP: 351.4 to 362.5</locationdescription>
    <numlocations>1</numlocations>
    <constructionamount>$36,983,000.00</constructionamount>
    <description>Victor (Exit 45, MP 351.4) to Henrietta (Exit 46, MP 362.5): Pavement Rehabilition | Related: I-390 (Exit 46, MP 362.5) to LeRoy (Exit 47, MP 378.2): Pavement Resurfacing</description>
    <completiondate>11/20/2025</completiondate>
    <lettingdate>06/05/2024</lettingdate>
    <contractor>Sealand Contractors Corporation</contractor>
    <contractno>TAB 24-25/D214983</contractno>
    <contractno>TAB 24-25/D214983</contractno>
    <division>Buffalo</division>
    <id>H142.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-78.25855</longitude>
    <latitude>43.01666</latitude>
    <locationdescription>ML - MP: 393.7 to 404.7</locationdescription>
    <numlocations>1</numlocations>
    <constructionamount>$22,994,020.10</constructionamount>
    <description>West of Batavia (MP 393.7) to West of Pembroke (MP 404.7): Pavement Resurfacing, Paving Only</description>
    <completiondate>06/30/2023</completiondate>
    <lettingdate>03/30/2022</lettingdate>
    <contractor>Oakgrove Construction, Inc.</contractor>
    <contractno>TAB 22-13/D214868</contractno>
    <contractno>TAB 22-13/D214868</contractno>
    <division>Buffalo</division>
    <id>H143.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-74.113669</longitude>
    <latitude>41.319824</latitude>
    <locationdescription>ML - MP: 46 to 60.1</locationdescription>
    <numlocations>1</numlocations>
    <constructionamount>$38,028,827.00</constructionamount>
    <description>North of Harriman Toll Barrier (MP 46.0) to Newburgh (MP 60.1): Pavement Resurfacing</description>
    <completiondate>06/04/2025</completiondate>
    <lettingdate>02/21/2024</lettingdate>
    <contractor>Cristel Group, Inc.</contractor>
    <contractno>TANY 24-8/D214964</contractno>
    <contractno>TANY 24-8/D214964</contractno>
    <division>New York</division>
    <id>H161.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-74.618733</longitude>
    <latitude>42.932581</latitude>
    <locationdescription>ML - MP: 197.9 to 210.3</locationdescription>
    <numlocations>1</numlocations>
    <constructionamount>$13,799,683.00</constructionamount>
    <description>West of Canajoharie (MP 197.9) to east of Little Falls (MP 210.3): Pavement Resurfacing</description>
    <completiondate>12/17/2025</completiondate>
    <lettingdate>03/06/2024</lettingdate>
    <contractor>Heidelberg Materials Northeast-NY LLC</contractor>
    <contractno>TAS 24-14/D214969</contractno>
    <contractno>TAS 24-14/D214969</contractno>
    <division>Syracuse</division>
    <id>H162.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-74.145206</longitude>
    <latitude>41.120484</latitude>
    <locationdescription>ML - MP: 29.4 to 38.7</locationdescription>
    <numlocations>1</numlocations>
    <constructionamount>$44,611,789.00</constructionamount>
    <description>I-287/Route 17S (Exit 15, MP 29.4) to north of Suffern (MP 38.7): Pavement Resurfacing</description>
    <completiondate>10/27/2023</completiondate>
    <lettingdate>05/11/2022</lettingdate>
    <contractor>Yonkers Contracting Company, Inc.</contractor>
    <contractno>TANY 22-21/D214875</contractno>
    <contractno>TANY 22-21/D214875</contractno>
    <division>New York</division>
    <id>H165.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-74.319887</longitude>
    <latitude>42.933582</latitude>
    <locationdescription>ML - MP: 180 to 197.9</locationdescription>
    <numlocations>1</numlocations>
    <constructionamount>$4,598,975.95</constructionamount>
    <description>Albany Division MP 180 to MP 197.9 Pavement Resurfacing and Repairs at Various Locations 2023</description>
    <completiondate>11/30/2023</completiondate>
    <lettingdate>05/31/2023</lettingdate>
    <contractor>HEIDELBERG MATERIALS NORTHEAST</contractor>
    <contractno>TAA 23-19/D214924</contractno>
    <contractno>TAA 23-19/D214924</contractno>
    <division>Albany</division>
    <id>H302.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.852808</longitude>
    <latitude>42.351437</latitude>
    <locationdescription>ML - MP: 121.2 to 141.9</locationdescription>
    <numlocations>1</numlocations>
    <constructionamount>$6,234,179.63</constructionamount>
    <description>North of Coxsackie (MP 121.2) to south of Albany (MP 141.9): Safety Upgrades</description>
    <completiondate>08/31/2022</completiondate>
    <lettingdate>04/21/2021</lettingdate>
    <contractor>Callanan Industries, Inc.</contractor>
    <contractno>TAA 21-6/D214806</contractno>
    <contractno>TAA 21-6/D214806</contractno>
    <division>Albany</division>
    <id>H331.3</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-76.186625</longitude>
    <latitude>43.104392</latitude>
    <locationdescription>ML - MP: 284.1 to 289.3</locationdescription>
    <numlocations>1</numlocations>
    <constructionamount>$88,268,426.84</constructionamount>
    <description>Electronics Parkway (Exit 37, MP 284.1) to I-690 (Exit 39, MP 289.3): Pavement Replacement | Related: Thruway Bridge over CSX Railroad (Geddes): Replacement</description>
    <completiondate>11/22/2023</completiondate>
    <lettingdate>10/06/2021</lettingdate>
    <contractor>Harrison &amp; Burrowes Bridge Constructors, Inc.</contractor>
    <contractno>TAS 21-16/D214826</contractno>
    <contractno>TAS 21-16/D214826</contractno>
    <division>Syracuse</division>
    <id>H337.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-74.130785</longitude>
    <latitude>42.904599</latitude>
    <locationdescription>ML - MP: 170 to 197.9</locationdescription>
    <numlocations>1</numlocations>
    <constructionamount>$8,724,597.42</constructionamount>
    <description>East of Amsterdam (MP 170.0) to east of Little Falls (MP 197.9): Safety Upgrades</description>
    <completiondate>11/04/2020</completiondate>
    <lettingdate>12/04/2019</lettingdate>
    <contractor>Callanan Industries, Inc.</contractor>
    <contractno>TAA 19-7/D214708</contractno>
    <contractno>TAA 19-7/D214708</contractno>
    <division>Albany</division>
    <id>H338.2</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-79.548262</longitude>
    <latitude>42.350584</latitude>
    <locationdescription>ML - MP: 483 to 496</locationdescription>
    <numlocations>1</numlocations>
    <constructionamount>$21,532,209.78</constructionamount>
    <description>East of Westfield (MP 483.0) to Pennsylvania State Line (MP 496.0) Eastbound: Pavement Resurfacing</description>
    <completiondate>10/31/2022</completiondate>
    <lettingdate>03/31/2021</lettingdate>
    <contractor>Oakgrove Construction, Inc</contractor>
    <contractno>TAB 21-7/D214768</contractno>
    <contractno>TAB 21-7/D214768</contractno>
    <division>Buffalo</division>
    <id>H341.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.919815</longitude>
    <latitude>41.074462</latitude>
    <locationdescription>ML - MP: 16.2 to 24</locationdescription>
    <numlocations>1</numlocations>
    <constructionamount>$17,755,000.00</constructionamount>
    <description>South of Nyack (MP 16.2) to south of Spring Valley Toll Barrier: Pavement Resurfacing</description>
    <completiondate>11/18/2022</completiondate>
    <lettingdate>02/02/2022</lettingdate>
    <contractor>Crisdel Group, Inc.</contractor>
    <contractno>TANY 22-6/D214854</contractno>
    <contractno>TANY 22-6/D214854</contractno>
    <division>New York</division>
    <id>H342.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.680271</longitude>
    <latitude>40.987414</latitude>
    <locationdescription>BOSTON POST ROAD RT. 1 BRIDGE</locationdescription>
    <numlocations>3</numlocations>
    <constructionamount>$20,228,907.00</constructionamount>
    <description>I-95, New England Thruway: North of Larchmont (Exit 17) to north of White Plains (Exit 18B) Northbound Only and north of Rye (Exit 19) to north of I-287 (Exit 21): Pavement Resurfacing</description>
    <completiondate>08/26/2022</completiondate>
    <lettingdate>05/05/2021</lettingdate>
    <contractor>Yonkers Contracting Company, Inc.</contractor>
    <contractno>TANE 21-9/D214781</contractno>
    <contractno>TANE 21-9/D214781</contractno>
    <division>New York</division>
    <id>H343.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.691364</longitude>
    <latitude>40.981721</latitude>
    <locationdescription>NE - MP: 613 to 614.1</locationdescription>
    <numlocations>2</numlocations>
    <constructionamount>$20,228,907.00</constructionamount>
    <description>I-95, New England Thruway: North of Exit 17 to north of Exit 18B Northbound Only and north of Exit 19 to north of Exit 21: Pavement Resurfacing</description>
    <completiondate>08/26/2022</completiondate>
    <lettingdate>05/05/2021</lettingdate>
    <contractor>Yonkers Contracting Company, Inc.</contractor>
    <contractno>TANE 21-9/D214781</contractno>
    <contractno>TANE 21-9/D214781</contractno>
    <division>New York</division>
    <id>H343.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.728434</longitude>
    <latitude>40.965724</latitude>
    <locationdescription>WEST STREET BRIDGE</locationdescription>
    <numlocations>3</numlocations>
    <constructionamount>$20,228,907.00</constructionamount>
    <description>I-95, New England Thruway: North of Larchmont (Exit 17) to north of White Plains (Exit 18B) Northbound Only and north of Rye (Exit 19) to north of I-287 (Exit 21): Pavement Resurfacing</description>
    <completiondate>08/26/2022</completiondate>
    <lettingdate>05/05/2021</lettingdate>
    <contractor>Yonkers Contracting Company, Inc.</contractor>
    <contractno>TANE 21-9/D214781</contractno>
    <contractno>TANE 21-9/D214781</contractno>
    <division>New York</division>
    <id>H343.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.741739</longitude>
    <latitude>40.956969</latitude>
    <locationdescription>OLD WHITE PLAINS ROAD BRIDGE</locationdescription>
    <numlocations>3</numlocations>
    <constructionamount>$20,228,907.00</constructionamount>
    <description>I-95, New England Thruway: North of Larchmont (Exit 17) to north of White Plains (Exit 18B) Northbound Only and north of Rye (Exit 19) to north of I-287 (Exit 21): Pavement Resurfacing</description>
    <completiondate>08/26/2022</completiondate>
    <lettingdate>05/05/2021</lettingdate>
    <contractor>Yonkers Contracting Company, Inc.</contractor>
    <contractno>TANE 21-9/D214781</contractno>
    <contractno>TANE 21-9/D214781</contractno>
    <division>New York</division>
    <id>H343.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-76.858505</longitude>
    <latitude>42.966486</latitude>
    <locationdescription>ML - MP: 320.7 to 327.5</locationdescription>
    <numlocations>1</numlocations>
    <constructionamount>$15,437,115.00</constructionamount>
    <description>Waterloo (Exit 41, MP 320.70) to Geneva (Exit 42, MP 327.50): Pavement Resurfacing | Related: Weedsport (Exit 40, MP 304.5) to east of Waterloo (MP 313.8): Safety Upgrades</description>
    <completiondate>11/04/2022</completiondate>
    <lettingdate>02/16/2022</lettingdate>
    <contractor>Rifenburg Construction, Inc.</contractor>
    <contractno>TAS 22-7/D214855</contractno>
    <contractno>TAS 22-7/D214855</contractno>
    <division>Syracuse</division>
    <id>H350.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.826357</longitude>
    <latitude>40.853287</latitude>
    <locationdescription>NE - MP: 600 to 614.1</locationdescription>
    <numlocations>1</numlocations>
    <constructionamount>$12,898,985.00</constructionamount>
    <description>I-95, New England Thruway: Highway Improvements 2020-2021</description>
    <completiondate>07/22/2021</completiondate>
    <lettingdate>11/20/2019</lettingdate>
    <contractor>Grace Industries</contractor>
    <contractno>TANE 19-40/D214758</contractno>
    <contractno>TANE 19-40/D214758</contractno>
    <division>New York</division>
    <id>H351.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.826357</longitude>
    <latitude>40.853287</latitude>
    <locationdescription>NE - MP: 600 to 614.1</locationdescription>
    <numlocations>1</numlocations>
    <constructionamount>$8,494,250.00</constructionamount>
    <description>I-95, New England Thruway: Highway Improvements 2022-2023</description>
    <completiondate>07/11/2023</completiondate>
    <lettingdate>09/15/2021</lettingdate>
    <contractor>Grace Industries, LLC.</contractor>
    <contractno>TANE 21-13/D214827</contractno>
    <contractno>TANE 21-13/D214827</contractno>
    <division>New York</division>
    <id>H353.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-78.947014</longitude>
    <latitude>42.674293</latitude>
    <locationdescription>ML - MP: 443.6 to 451.5</locationdescription>
    <numlocations>2</numlocations>
    <constructionamount>$4,712,891.31</constructionamount>
    <description>West of Hamburg (MP 438.50) to east of Eden-Angola (MP 443.60) (WB) and east Angola (MP 443.6) to east of Silver Creek (MP 451.5): Microsurfacing</description>
    <completiondate>11/30/2023</completiondate>
    <lettingdate>05/10/2023</lettingdate>
    <contractor>Mclaughlin Construction Corp.</contractor>
    <contractno>TAB 23-16/D214921</contractno>
    <contractno>TAB 23-16/D214921</contractno>
    <division>Buffalo</division>
    <id>H366.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-74.073253</longitude>
    <latitude>41.714495</latitude>
    <locationdescription>ML - MP: 74.5 to 76.5</locationdescription>
    <numlocations>1</numlocations>
    <constructionamount>$5,237,091.00</constructionamount>
    <description>South of New Paltz (MP 74.1) to New Paltz (Exit 18, MP 76.5): Pavement Resurfacing</description>
    <completiondate>10/28/2023</completiondate>
    <lettingdate>08/31/2022</lettingdate>
    <contractor>D.A Collins Construction</contractor>
    <contractno>TANY 22-33/D214902</contractno>
    <contractno>TANY 22-33/D214902</contractno>
    <division>New York</division>
    <id>H369.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-74.142558</longitude>
    <latitude>41.283454</latitude>
    <locationdescription>ML - MP: 43 to 46</locationdescription>
    <numlocations>1</numlocations>
    <constructionamount>$6,738,296.70</constructionamount>
    <description>South of Harriman Toll Barrier (Exit 16, MP 43.5) to north of Woodbury Toll Barrier (MP 46.0): Pavement Resurfacing</description>
    <completiondate>11/18/2022</completiondate>
    <lettingdate>01/26/2022</lettingdate>
    <contractor>Kubricky Construction Corporation</contractor>
    <contractno>TANY 22-4/D214852</contractno>
    <contractno>TANY 22-4/D214852</contractno>
    <division>New York</division>
    <id>H440.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-79.292473</longitude>
    <latitude>42.465996</latitude>
    <locationdescription>ML - MP: 467 to 483</locationdescription>
    <numlocations>1</numlocations>
    <constructionamount>$44,994,455.05</constructionamount>
    <description>MP 467.0 to 483.0 -Pavement Rehabilitation</description>
    <completiondate>08/29/2025</completiondate>
    <lettingdate>04/17/2024</lettingdate>
    <contractor>Oakgrove Construction</contractor>
    <contractno>TAB 24-13/D214968</contractno>
    <contractno>TAB 24-13/D214968</contractno>
    <division>Buffalo</division>
    <id>H446.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-74.074464</longitude>
    <latitude>41.509472</latitude>
    <locationdescription>ML - MP: 60.1 to 68</locationdescription>
    <numlocations>1</numlocations>
    <constructionamount>$9,687,662.99</constructionamount>
    <description>Newburgh (Exit 17, MP 60.1) to south of New Paltz (MP 68.0): Pavement Resurfacing</description>
    <completiondate>10/27/2023</completiondate>
    <lettingdate>01/11/2023</lettingdate>
    <contractor>Callanan Industries Inc.</contractor>
    <contractno>TANY 23-3/D214906</contractno>
    <contractno>TANY 23-3/D214906</contractno>
    <division>New York</division>
    <id>H555.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-73.826385</longitude>
    <latitude>40.856202</latitude>
    <locationdescription>NE - MP: 600.17 to 614.1</locationdescription>
    <numlocations>1</numlocations>
    <constructionamount>$8,202,924.82</constructionamount>
    <description>Pavement repairs at various locations on the New England Thruway (I-95) from MP 600.17 to MP 614.10: Highway Improvements 2023-2024</description>
    <completiondate>12/31/2024</completiondate>
    <lettingdate>01/18/2023</lettingdate>
    <contractor>JR Cruz Corp</contractor>
    <contractno>TANE 23-5/D214909</contractno>
    <contractno>TANE 23-5/D214909</contractno>
    <division>New York</division>
    <id>H556.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-74.040308</longitude>
    <latitude>41.097582</latitude>
    <locationdescription>GS - MP: 640 to 642.4</locationdescription>
    <numlocations>1</numlocations>
    <constructionamount>$6,386,590.00</constructionamount>
    <description>Garden State Parkway Connector (MP GS0.00 to MP GS2.40): Pavement Resurfacing</description>
    <completiondate>11/18/2022</completiondate>
    <lettingdate>02/16/2022</lettingdate>
    <contractor>Crisdel Group, Inc.</contractor>
    <contractno>TAGS 22-5/D214853</contractno>
    <contractno>TAGS 22-5/D214853</contractno>
    <division>New York</division>
    <id>H864.2</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-74.010147</longitude>
    <latitude>41.979036</latitude>
    <locationdescription>ML - MP: 93.8 to 100.8</locationdescription>
    <numlocations>1</numlocations>
    <constructionamount>$9,632,780.95</constructionamount>
    <description>North of Kingston (MP 93.8) to south of Saugerties (MP 100.8): Pavement Resurfacing, Paving Only</description>
    <completiondate>11/30/2022</completiondate>
    <lettingdate>02/23/2022</lettingdate>
    <contractor>Callanan Industries, Inc.</contractor>
    <contractno>TAA 22-14/D214869</contractno>
    <contractno>TAA 22-14/D214869</contractno>
    <division>Albany</division>
    <id>H1138.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-77.959636</longitude>
    <latitude>43.028804</latitude>
    <locationdescription>ML - MP: 378.2 to 393.7</locationdescription>
    <numlocations>1</numlocations>
    <constructionamount>$23,968,663.25</constructionamount>
    <description>LeRoy (Exit 47, MP 378.2) to West of Batavia (Exit 48, MP 393.7): Pavement Resurfacing, Paving Only</description>
    <completiondate>06/30/2023</completiondate>
    <lettingdate>03/16/2022</lettingdate>
    <contractor>Cold Spring Construction Company.</contractor>
    <contractno>TAB 22-12/D214864</contractno>
    <contractno>TAB 22-12/D214864</contractno>
    <division>Buffalo</division>
    <id>H1153.1</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-77.959636</longitude>
    <latitude>43.028804</latitude>
    <locationdescription>ML - MP: 378.2 to 393.7</locationdescription>
    <numlocations>1</numlocations>
    <constructionamount>$4,768,507.75</constructionamount>
    <description>LeRoy (Exit 47, MP 378.2) to West of Batavia (Exit 48, MP 393.7): Safety Upgrades | Related: West of Batavia (MP 393.7) to West of Pembroke (MP 404.7): Safety Upgrades</description>
    <completiondate>10/27/2023</completiondate>
    <lettingdate>10/19/2022</lettingdate>
    <contractor>McGlaughlin Construction Corp dba Ed Bauer Con</contractor>
    <contractno>TAB 22-23/D214883</contractno>
    <contractno>TAB 22-23/D214883</contractno>
    <division>Buffalo</division>
    <id>H1153.2</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-78.794711</longitude>
    <latitude>42.813289</latitude>
    <locationdescription>ML - MP: 430.51 to 496</locationdescription>
    <numlocations>2</numlocations>
    <constructionamount>$441,651,625.04</constructionamount>
    <description>New Facilities for Cashless Tolling for Ticketed System</description>
    <completiondate>10/18/2021</completiondate>
    <lettingdate>06/06/2019</lettingdate>
    <contractor>Cashless Tolling Constructors, LLC</contractor>
    <contractno>TA 19-1/D800002</contractno>
    <contractno>TA 19-1/D800002</contractno>
    <division>Thruway Wide</division>
    <id>I102.10</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <completedcapprojects>
    <longitude>-74.125656</longitude>
    <latitude>41.308844</latitude>
    <locationdescription>ML - MP: 45.03 to 419.69</locationdescription>
    <numlocations>2</numlocations>
    <constructionamount>$441,651,625.04</constructionamount>
    <description>New Facilities for Cashless Tolling for Ticketed System</description>
    <completiondate>10/18/2021</completiondate>
    <lettingdate>06/06/2019</lettingdate>
    <contractor>Cashless Tolling Constructors, LLC</contractor>
    <contractno>TA 19-1/D800002</contractno>
    <contractno>TA 19-1/D800002</contractno>
    <division>Thruway Wide</division>
    <id>I102.10</id>
    <projectclass>T</projectclass>
  </completedcapprojects>
  <plannedcapprojects>
    <longitude>-75.582104</longitude>
    <latitude>43.12377</latitude>
    <locationdescription>ML - MP: 252.7</locationdescription>
    <numlocations>1</numlocations>
    <description>MP 252.70: Verona Maintenance Section - Equipment Storage Building Wash Bay</description>
    <division>Syracuse</division>
    <id>A173.1</id>
    <projectclass>T</projectclass>
    <estimatedlettingdate>12/16/2026</estimatedlettingdate>
  </plannedcapprojects>
  <plannedcapprojects>
    <longitude>-76.564931</longitude>
    <latitude>43.061083</latitude>
    <locationdescription>ML - MP: 304.2</locationdescription>
    <numlocations>1</numlocations>
    <description>MP 304.2: Weedsport Maintenance - Construct Municipal Sewer Connection</description>
    <division>Syracuse</division>
    <id>A354.2</id>
    <projectclass>T</projectclass>
    <estimatedlettingdate>04/22/2026</estimatedlettingdate>
  </plannedcapprojects>
  <plannedcapprojects>
    <longitude>-73.956535</longitude>
    <latitude>42.110831</latitude>
    <locationdescription>Malden Service Area</locationdescription>
    <numlocations>1</numlocations>
    <description>Harriman Maintenance Section and Toll Building (Exit 16, MP 45.2): Connect to Municipal Water, Sewer and Gas</description>
    <division>New York</division>
    <id>A750.1</id>
    <projectclass>T</projectclass>
    <estimatedlettingdate>12/17/2027</estimatedlettingdate>
  </plannedcapprojects>
  <plannedcapprojects>
    <longitude>-74.128119</longitude>
    <latitude>41.313857</latitude>
    <locationdescription>Harriman Toll Plaza</locationdescription>
    <numlocations>1</numlocations>
    <description>Harriman Maintenance Section and Toll Building (Exit 16): Connect to Municipal Water, Sewer and Gas</description>
    <division>New York</division>
    <id>A750.1</id>
    <projectclass>T</projectclass>
    <estimatedlettingdate>11/11/2026</estimatedlettingdate>
  </plannedcapprojects>
  <plannedcapprojects>
    <longitude>-74.122654</longitude>
    <latitude>41.310654</latitude>
    <locationdescription>ML - MP: 45.2</locationdescription>
    <numlocations>1</numlocations>
    <description>Harriman Maintenance Section and Toll Building (Exit 16, MP 45.2): Connect to Municipal Water, Sewer and Gas</description>
    <division>New York</division>
    <id>A750.1</id>
    <projectclass>T</projectclass>
    <estimatedlettingdate>11/11/2026</estimatedlettingdate>
  </plannedcapprojects>
  <plannedcapprojects>
    <longitude>-74.802191</longitude>
    <latitude>43.017114</latitude>
    <locationdescription>Iroquois Service Area</locationdescription>
    <numlocations>2</numlocations>
    <description>MP 210 Iroquois and Indian Castle Service Area - Rehabilitate/Replace Wastewater Treatment Plant</description>
    <division>Syracuse</division>
    <id>A865.1</id>
    <projectclass>T</projectclass>
    <estimatedlettingdate>12/31/2027</estimatedlettingdate>
  </plannedcapprojects>
  <plannedcapprojects>
    <longitude>-75.841598</longitude>
    <latitude>43.096069</latitude>
    <locationdescription>Chittenango Service Area</locationdescription>
    <numlocations>2</numlocations>
    <description>MP 210 Iroquois and Indian Castle Service Area - Rehabilitate/Replace Wastewater Treatment Plant</description>
    <division>Syracuse</division>
    <id>A865.1</id>
    <projectclass>T</projectclass>
    <estimatedlettingdate>12/31/2027</estimatedlettingdate>
  </plannedcapprojects>
  <plannedcapprojects>
    <longitude>-76.671009</longitude>
    <latitude>43.023826</latitude>
    <locationdescription>Port Byron Service Area</locationdescription>
    <numlocations>1</numlocations>
    <description>MP 310 Port Byron - Rehabilitate/Replace Wastewater Treatment Plant</description>
    <division>Syracuse</division>
    <id>A865.2</id>
    <projectclass>T</projectclass>
    <estimatedlettingdate>12/31/2027</estimatedlettingdate>
  </plannedcapprojects>
  <plannedcapprojects>
    <longitude>-73.892829</longitude>
    <latitude>42.243431</latitude>
    <locationdescription>CATSKILL CREEK BRIDGE</locationdescription>
    <numlocations>2</numlocations>
    <description>Kaaterskill/Catskill Bridge Improvement Project</description>
    <division>Albany</division>
    <id>B111.1</id>
    <projectclass>T</projectclass>
    <estimatedlettingdate>04/29/2026</estimatedlettingdate>
  </plannedcapprojects>
  <plannedcapprojects>
    <longitude>-73.914588</longitude>
    <latitude>42.217882</latitude>
    <locationdescription>KAATERSKILL CR &amp; CO RD 30 BRIDGE</locationdescription>
    <numlocations>2</numlocations>
    <description>Kaaterskill/Catskill Bridge Improvement Project</description>
    <division>Albany</division>
    <id>B111.1</id>
    <projectclass>T</projectclass>
    <estimatedlettingdate>04/29/2026</estimatedlettingdate>
  </plannedcapprojects>
  <plannedcapprojects>
    <longitude>-73.832923</longitude>
    <latitude>42.383547</latitude>
    <locationdescription>COXSACKIE-RAVENA RT 9W BRIDGE</locationdescription>
    <numlocations>1</numlocations>
    <description>MP 123.69: 9W NB Ramp Bridge over Thruway - Element Specific Repairs
(Combined w/ B139.1 and B159.1)</description>
    <division>Albany</division>
    <id>B123.1</id>
    <projectclass>T</projectclass>
    <estimatedlettingdate>07/01/2026</estimatedlettingdate>
  </plannedcapprojects>
  <plannedcapprojects>
    <longitude>-74.016885</longitude>
    <latitude>42.796307</latitude>
    <locationdescription>SCHENECTADY-MARIAVILLE BRIDGE</locationdescription>
    <numlocations>1</numlocations>
    <description>MP 159.23, Mariaville Road (CR 159) Bridge over Thruway - Element Specific Repairs
(Combined B123.1 and B139.1)</description>
    <division>Albany</division>
    <id>B159.1</id>
    <projectclass>T</projectclass>
    <estimatedlettingdate>07/01/2026</estimatedlettingdate>
  </plannedcapprojects>
  <plannedcapprojects>
    <longitude>-74.115575</longitude>
    <latitude>41.335032</latitude>
    <locationdescription>SMITH CLOVE ROAD BRIDGE</locationdescription>
    <numlocations>1</numlocations>
    <description>MP: 47.04 Rehabilitation of Thruway Bridge over Smith Clove Rd. (CR 19) Combined with B884.1 and H385.1</description>
    <division>New York</division>
    <id>B378.1</id>
    <projectclass>T</projectclass>
    <estimatedlettingdate>01/21/2026</estimatedlettingdate>
  </plannedcapprojects>
  <plannedcapprojects>
    <longitude>-76.683189</longitude>
    <latitude>43.018271</latitude>
    <locationdescription>CRANE BROOK BRIDGE</locationdescription>
    <numlocations>1</numlocations>
    <description>MP 310.98: Thruway Bridge over Crane Brook - Replacement
(Combined w/ B508.1)</description>
    <division>Syracuse</division>
    <id>B498.1</id>
    <projectclass>T</projectclass>
    <estimatedlettingdate>11/11/2026</estimatedlettingdate>
  </plannedcapprojects>
  <plannedcapprojects>
    <longitude>-73.856702</longitude>
    <latitude>40.931501</latitude>
    <locationdescription>CROSS COUNTY PARKWAY BRIDGE</locationdescription>
    <numlocations>1</numlocations>
    <description>MP 2.20: Cross County Parkway Thruway Over Bridge Rehab</description>
    <division>New York</division>
    <id>B568.2</id>
    <projectclass>T</projectclass>
    <estimatedlettingdate>10/07/2026</estimatedlettingdate>
  </plannedcapprojects>
  <plannedcapprojects>
    <longitude>-73.826357</longitude>
    <latitude>40.853287</latitude>
    <locationdescription>NE - MP: 600 to 615.1</locationdescription>
    <numlocations>3</numlocations>
    <description>New York Division-Wide Joint Replacement 2026</description>
    <division>New York</division>
    <id>B729.4</id>
    <projectclass>T</projectclass>
    <estimatedlettingdate>10/07/2026</estimatedlettingdate>
  </plannedcapprojects>
  <plannedcapprojects>
    <longitude>-74.040308</longitude>
    <latitude>41.097582</latitude>
    <locationdescription>GS - MP: 640 to 642.4</locationdescription>
    <numlocations>3</numlocations>
    <description>New York Division-Wide Joint Replacement 2026</description>
    <division>New York</division>
    <id>B729.4</id>
    <projectclass>T</projectclass>
    <estimatedlettingdate>10/07/2026</estimatedlettingdate>
  </plannedcapprojects>
  <plannedcapprojects>
    <longitude>-73.87816</longitude>
    <latitude>40.905671</latitude>
    <locationdescription>ML - MP: 0 to 76.5</locationdescription>
    <numlocations>3</numlocations>
    <description>New York Division-Wide Joint Replacement 2026</description>
    <division>New York</division>
    <id>B729.4</id>
    <projectclass>T</projectclass>
    <estimatedlettingdate>10/07/2026</estimatedlettingdate>
  </plannedcapprojects>
  <plannedcapprojects>
    <longitude>-74.040329</longitude>
    <latitude>41.097602</latitude>
    <locationdescription>GARDEN STATE PARKWAY CONN. BRIDGE</locationdescription>
    <numlocations>1</numlocations>
    <description>NY Division: Bridge Preservation for MP 23.53 - Garden State Parkway Connector over Thruway</description>
    <division>New York</division>
    <id>B776.1</id>
    <projectclass>T</projectclass>
    <estimatedlettingdate>09/23/2026</estimatedlettingdate>
  </plannedcapprojects>
  <plannedcapprojects>
    <longitude>-74.00347</longitude>
    <latitude>42.000275</latitude>
    <locationdescription>LAKE KATRINE RD. BRIDGE</locationdescription>
    <numlocations>4</numlocations>
    <description>MP 95.27 Sawkill-Ruby Rd, MP 172.55 Amsterdam-Morris Cor. Rt 160, MP 812.89 Old Chatham-Malden Br Tnpk, MP 819.04 Frisbee Creek (EB): Substructure Rehabilitations in Albany Division</description>
    <division>Albany</division>
    <id>B790.1</id>
    <projectclass>T</projectclass>
    <estimatedlettingdate>09/30/2026</estimatedlettingdate>
  </plannedcapprojects>
  <plannedcapprojects>
    <longitude>-73.487311</longitude>
    <latitude>42.388602</latitude>
    <locationdescription>FRISBEE CREEK (EB) BRIDGE</locationdescription>
    <numlocations>4</numlocations>
    <description>MP 95.27 Sawkill-Ruby Rd, MP 172.55 Amsterdam-Morris Cor. Rt 160, MP 812.89 Old Chatham-Malden Br Tnpk, MP 819.04 Frisbee Creek (EB): Substructure Rehabilitations in Albany Division</description>
    <division>Albany</division>
    <id>B790.1</id>
    <projectclass>T</projectclass>
    <estimatedlettingdate>09/30/2026</estimatedlettingdate>
  </plannedcapprojects>
  <plannedcapprojects>
    <longitude>-74.177151</longitude>
    <latitude>42.91879</latitude>
    <locationdescription>AMSTERDAM-MORRIS COR. RT160 BRIDGE</locationdescription>
    <numlocations>4</numlocations>
    <description>MP 95.27 Sawkill-Ruby Rd, MP 172.55 Amsterdam-Morris Cor. Rt 160, MP 812.89 Old Chatham-Malden Br Tnpk, MP 819.04 Frisbee Creek (EB): Substructure Rehabilitations in Albany Division</description>
    <division>Albany</division>
    <id>B790.1</id>
    <projectclass>T</projectclass>
    <estimatedlettingdate>09/30/2026</estimatedlettingdate>
  </plannedcapprojects>
  <plannedcapprojects>
    <longitude>-73.567285</longitude>
    <latitude>42.446698</latitude>
    <locationdescription>OLD CHATHAM-MALDEN BR. TNPK BRIDGE</locationdescription>
    <numlocations>4</numlocations>
    <description>MP 95.27 Sawkill-Ruby Rd, MP 172.55 Amsterdam-Morris Cor. Rt 160, MP 812.89 Old Chatham-Malden Br Tnpk, MP 819.04 Frisbee Creek (EB): Substructure Rehabilitations in Albany Division</description>
    <division>Albany</division>
    <id>B790.1</id>
    <projectclass>T</projectclass>
    <estimatedlettingdate>09/30/2026</estimatedlettingdate>
  </plannedcapprojects>
  <plannedcapprojects>
    <longitude>-74.076755</longitude>
    <latitude>41.104189</latitude>
    <locationdescription>ERIE RR (NB) BRIDGE</locationdescription>
    <numlocations>2</numlocations>
    <description>MP 25.52 &amp; 25.53 Thruway Bridges over Abandoned RR (South of Airmont Road): Rehabilitations</description>
    <division>New York</division>
    <id>B799.1</id>
    <projectclass>T</projectclass>
    <estimatedlettingdate>12/02/2026</estimatedlettingdate>
  </plannedcapprojects>
  <plannedcapprojects>
    <longitude>-74.076903</longitude>
    <latitude>41.104041</latitude>
    <locationdescription>ERIE RR (SB) BRIDGE</locationdescription>
    <numlocations>2</numlocations>
    <description>MP 25.52 &amp; 25.53 Thruway Bridges over Abandoned RR (South of Airmont Road): Rehabilitations</description>
    <division>New York</division>
    <id>B799.1</id>
    <projectclass>T</projectclass>
    <estimatedlettingdate>12/02/2026</estimatedlettingdate>
  </plannedcapprojects>
  <plannedcapprojects>
    <longitude>-74.117349</longitude>
    <latitude>41.342782</latitude>
    <locationdescription>PINE HILL ROAD BRIDGE</locationdescription>
    <numlocations>1</numlocations>
    <description>Pine Hill Road Bridge over Thruway: Replacement</description>
    <division>New York</division>
    <id>B884.1</id>
    <projectclass>T</projectclass>
    <estimatedlettingdate>01/21/2026</estimatedlettingdate>
  </plannedcapprojects>
  <plannedcapprojects>
    <longitude>-76.980093</longitude>
    <latitude>42.954869</latitude>
    <locationdescription>ML - MP: 327 to 347</locationdescription>
    <numlocations>1</numlocations>
    <description>MP 327 to 347: Pavement Repairs</description>
    <division>Syracuse</division>
    <id>H43.1</id>
    <projectclass>T</projectclass>
    <estimatedlettingdate>01/21/2026</estimatedlettingdate>
  </plannedcapprojects>
  <plannedcapprojects>
    <longitude>-77.447179</longitude>
    <latitude>43.011786</latitude>
    <locationdescription>ML - MP: 351.4 to 362.5</locationdescription>
    <numlocations>1</numlocations>
    <description>Victor (Exit 45, MP 351.4) to Henrietta (Exit 46, MP 362.5): Safety Upgrades</description>
    <division>Buffalo</division>
    <id>H142.2</id>
    <projectclass>T</projectclass>
    <estimatedlettingdate>09/16/2026</estimatedlettingdate>
  </plannedcapprojects>
  <plannedcapprojects>
    <longitude>-75.588017</longitude>
    <latitude>43.123875</latitude>
    <locationdescription>ML - MP: 253 to 262</locationdescription>
    <numlocations>1</numlocations>
    <description>West of Verona (MP 253.0) to west of Canastota (MP 262.0): Pavement Resurfacing</description>
    <division>Syracuse</division>
    <id>H163.1</id>
    <projectclass>T</projectclass>
    <estimatedlettingdate>12/09/2026</estimatedlettingdate>
  </plannedcapprojects>
  <plannedcapprojects>
    <longitude>-74.077669</longitude>
    <latitude>41.686505</latitude>
    <locationdescription>ML - MP: 72.5 to 76.5</locationdescription>
    <numlocations>1</numlocations>
    <description>MP 72.5 to 76.5 Pavement Reconstruction</description>
    <division>New York</division>
    <id>H240.1</id>
    <projectclass>T</projectclass>
    <estimatedlettingdate>12/16/2026</estimatedlettingdate>
  </plannedcapprojects>
  <plannedcapprojects>
    <longitude>-77.655049</longitude>
    <latitude>43.047716</latitude>
    <locationdescription>ML - MP: 362.5 to 378.2</locationdescription>
    <numlocations>1</numlocations>
    <description>I-390 (Exit 46, MP 362.5) to LeRoy (Exit 47, MP 378.2): Safety Upgrades</description>
    <division>Buffalo</division>
    <id>H368.2</id>
    <projectclass>T</projectclass>
    <estimatedlettingdate>09/16/2026</estimatedlettingdate>
  </plannedcapprojects>
  <plannedcapprojects>
    <longitude>-76.282856</longitude>
    <latitude>43.108266</latitude>
    <locationdescription>ML - MP: 289.3 to 304.5</locationdescription>
    <numlocations>1</numlocations>
    <description>East of Fulton (Exit 39, MP 289.3) to west of Weedsport (Exit 40, MP 304.5): Concrete Pavement Restoration</description>
    <division>Syracuse</division>
    <id>H372.1</id>
    <projectclass>T</projectclass>
    <estimatedlettingdate>04/01/2026</estimatedlettingdate>
  </plannedcapprojects>
  <plannedcapprojects>
    <longitude>-74.113669</longitude>
    <latitude>41.319824</latitude>
    <locationdescription>ML - MP: 46 to 48</locationdescription>
    <numlocations>1</numlocations>
    <description>MP 46.0 to MP 48.0: Pavement Resurfacing (Combined with B378.1 and B884.1)</description>
    <division>New York</division>
    <id>H385.1</id>
    <projectclass>T</projectclass>
    <estimatedlettingdate>01/21/2026</estimatedlettingdate>
  </plannedcapprojects>
  <plannedcapprojects>
    <longitude>-73.87816</longitude>
    <latitude>40.905671</latitude>
    <locationdescription>ML - MP: 0 to 13</locationdescription>
    <numlocations>1</numlocations>
    <description>MP 0.00 to MP 13.00: Pavement Resurfacing</description>
    <division>New York</division>
    <id>H1045.1</id>
    <projectclass>T</projectclass>
    <estimatedlettingdate>11/18/2026</estimatedlettingdate>
  </plannedcapprojects>
</capitalprogram>